▮▮Coloprice
← All countries

4 facilities · Q3 2026 · H2 2025 – Q2 2026 ·

Data Center Colocation Costs in Azerbaijan: Q3 2026 Price Index

Compare 4 data centers in Azerbaijan across 2 operators: capacity, status, certifications, facilities and colocation pricing context.

4 facilities2 operators

Colocation pricing: Azerbaijan & other markets — The Colocation Price Index → · Best data centers in Azerbaijan →

· · ·

Average wholesale, $/kW/mo — Collecting

· · ·

Retail rack, $/mo — Collecting

· · ·

Year on year

$0.062

Commercial power, $/kWh

Q3 2026 · · H2 2025 – Q2 2026 · 4 Tier III/IV · 0 AI-ready · sources

How this market compares

Market$/kW/mo$/kWhfacilitiesRound-trip
Azerbaijan· · ·$0.0624
Georgia· · ·$0.1063
Armenia· · ·$0.1223
Kazakhstan· · ·$0.0869

Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index

Why prices sit where they do

Azerbaijan has the second-cheapest power in this index at $0.062/kWh, and one of the very few operators anywhere in the region that publishes a rate card at all. Delta Telecom lists 700 AZN per rack per month — about $412 at the 1.70 manat peg — plus 30 AZN per 1U, 76.27 AZN per kW of power and 152.55 AZN for rack cooling, all before 18% VAT. It also states both Uptime Tier III Design and Tier III Facility awards, the strongest certification claim in the Caucasus. The rest of the market is state infrastructure: three of the four recorded facilities belong to AzInTelecom and carry the Government Cloud, with a national data center on Absheron under construction against a EUR 43m EIB loan whose appraisal documents a colocation module for customer equipment. No operator here publishes capacity, so the megawatt column stays empty.

Frequently asked questions

How much does colocation cost in Azerbaijan?

No published wholesale $/kW benchmark exists for Azerbaijan yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 4 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.

Why is colocation priced the way it is in Azerbaijan?

Commercial electricity in Azerbaijan is $0.062 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 4 facilities in our catalog, 1 of them announced or under construction.

Where is colocation cheaper near Azerbaijan?

Azerbaijan sits at the cheaper end of its regional cluster on the inputs we can verify. The table below compares neighbouring hubs on power tariff, facility count and round-trip time.

Download this market (CSV)

Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.

CSV

Full Azerbaijan market report

Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.

We reply within one business day. No spam, no reselling your contacts.

Fitting out a facility? Racks, PDUs, containment and cooling sourced factory-direct from China — The Dream View Co., the team behind Coloprice.

Quick answer

How many data centers are in Azerbaijan?

Coloprice tracks 4 data centers in Azerbaijan: 3 operational, 1 under construction and 0 announced. The count covers publicly disclosed facilities and grows as operators publish new sites; every figure links to its primary source.

Data centers

FacilityOperatorCountryCityPower, MWTierScoreReviewsStatus
AzInTelecom Baku Data Center (AZCLOUD)AzInTelecomAzerbaijanBakuIII34EOperational
AzInTelecom Yevlakh Availability ZoneAzInTelecomAzerbaijanYevlakhIII*37DOperational
Data Center of Delta Telecom BakuDelta TelecomAzerbaijanBakuIII38DOperational
AzInTelecom National Data Center, AbsheronAzInTelecomAzerbaijanAbsheronIII*14EUnder construction