Data centers in Batam City: 2 facilities, colocation pricing
How many data centers are in Batam City?
Coloprice tracks 2 data centers in Batam City, Indonesia: 2 operational, 0 under construction and 0 announced, run by 2 operators.
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.063
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 1 Tier III/IV · 0 AI-ready · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| Batam City, Indonesia | · · · | $0.063 | 2 | — |
| Singapore | $403 | $0.270 | 60 | — |
| Malaysia | · · · | $0.135 | 84 | — |
| Vietnam | · · · | $0.080 | 46 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Frequently asked questions
How many data centers are in Batam City?
Coloprice tracks 2 data centers in Batam City, Indonesia: 2 operational, 0 under construction and 0 announced, run by 2 operators.
Which operators run data centers in Batam City?
By number of facilities tracked: PT. Ekamas Mora Republik Tbk (1), PT Omni Data Center Indonesia (1).
How much does colocation cost in Batam City, Indonesia?
No published wholesale $/kW benchmark exists for Batam City, Indonesia yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 2 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Batam City, Indonesia?
Commercial electricity in Batam City, Indonesia is $0.063 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 2 facilities in our catalog, 0 of them announced or under construction.
Where is colocation cheaper near Batam City, Indonesia?
Batam City, Indonesia sits at the cheaper end of its regional cluster on the inputs we can verify. The table below compares neighbouring hubs on power tariff, facility count and round-trip time.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Batam City, Indonesia market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Data centers
| Facility | Operator | Power, MW | Tier | Status |
|---|---|---|---|---|
| PT. Ekamas Mora Republik Tbk Nusantara Data Center | PT. Ekamas Mora Republik Tbk | — | 3 | Operational |
| OMNIDC Batam | PT Omni Data Center Indonesia | — | — | Operational |