1 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data centers in Tabanan: 1 facilities, colocation pricing
How many data centers are in Tabanan?
Coloprice tracks 1 data centers in Tabanan, Indonesia: 1 operational, 0 under construction and 0 announced, run by 1 operators.
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.063
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 1 Tier III/IV · 0 AI-ready · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| Tabanan, Indonesia | · · · | $0.063 | 1 | — |
| Singapore | $403 | $0.270 | 60 | — |
| Malaysia | · · · | $0.135 | 84 | — |
| Vietnam | · · · | $0.080 | 46 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Frequently asked questions
How many data centers are in Tabanan?
Coloprice tracks 1 data centers in Tabanan, Indonesia: 1 operational, 0 under construction and 0 announced, run by 1 operators.
Which operators run data centers in Tabanan?
By number of facilities tracked: PT Bank Rakyat Indonesia (Persero) Tbk (1).
How much does colocation cost in Tabanan, Indonesia?
No published wholesale $/kW benchmark exists for Tabanan, Indonesia yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 1 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Tabanan, Indonesia?
Commercial electricity in Tabanan, Indonesia is $0.063 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 1 facilities in our catalog, 0 of them announced or under construction.
Where is colocation cheaper near Tabanan, Indonesia?
Tabanan, Indonesia sits at the cheaper end of its regional cluster on the inputs we can verify. The table below compares neighbouring hubs on power tariff, facility count and round-trip time.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Tabanan, Indonesia market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Data centers
| Facility | Operator | Power, MW | Tier | Status |
|---|---|---|---|---|
| PT Bank Rakyat Indonesia (Persero) Tbk BRI Data Center TBN | PT Bank Rakyat Indonesia (Persero) Tbk | — | III | Operational |
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Indonesia
Colocation quotes in Tabanan: free, reply within one business day
Get Quotes →