5 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data centers in Bogor: 5 facilities, colocation pricing
Colocation pricing and providers in Bogor →
How many data centers are in Bogor?
Coloprice tracks 5 data centers in Bogor, Indonesia: 5 operational, 0 under construction and 0 announced, run by 5 operators.
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.063
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 3 Tier III/IV · 1 AI-ready · 505+ MW · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| Bogor, Indonesia | · · · | $0.063 | 5 | — |
| Singapore | $403 | $0.270 | 60 | — |
| Malaysia | · · · | $0.135 | 84 | — |
| Vietnam | · · · | $0.080 | 46 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Frequently asked questions
How many data centers are in Bogor?
Coloprice tracks 5 data centers in Bogor, Indonesia: 5 operational, 0 under construction and 0 announced, run by 5 operators.
Which operators run data centers in Bogor?
By number of facilities tracked: IndoData Center (Salim Group) (1), Faasri / Elitery (PT Data Sinergitama Jaya) (1), IndoKeppel (Keppel Data Centres / Salim Group joint venture) (1), PT. Telkom Data Ekosistem (1), PT Cloud Hosting Indonesia (1).
What is the total data center power capacity in Bogor?
Facilities that publish capacity add up to 505 MW (2 of 5 sites disclose a figure); the largest published site is IndoData Center Bogor with 500 MW.
How much does colocation cost in Bogor, Indonesia?
No published wholesale $/kW benchmark exists for Bogor, Indonesia yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 5 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Bogor, Indonesia?
Commercial electricity in Bogor, Indonesia is $0.063 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 5 facilities in our catalog, 0 of them announced or under construction.
Where is colocation cheaper near Bogor, Indonesia?
Bogor, Indonesia sits at the cheaper end of its regional cluster on the inputs we can verify. The table below compares neighbouring hubs on power tariff, facility count and round-trip time.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Bogor, Indonesia market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Data centers
| Facility | Operator | Power, MW | Tier | Status |
|---|---|---|---|---|
| IndoData Center Bogor | IndoData Center (Salim Group) | 500 | — | Operational |
| Elitery Data Center | Faasri / Elitery (PT Data Sinergitama Jaya) | — | III | Operational |
| IndoKeppel Data Centre 1 (IKDC1) | IndoKeppel (Keppel Data Centres / Salim Group joint venture) | 4.5 | III | Operational |
| PT. Telkom Data Ekosistem NeutraDC Sentul, GF, L1, & L2 | PT. Telkom Data Ekosistem | — | III | Operational |
| IDCloudHost Data Center Bogor | PT Cloud Hosting Indonesia | — | — | Operational |
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Nearby data center markets
Indonesia
Colocation quotes in Bogor: free, reply within one business day
Get Quotes →