▮▮Coloprice
← Indonesia

4 facilities · Q3 2026 · H2 2025 – Q2 2026 ·

Data centers in Batam: 4 facilities, colocation pricing

· · ·

Average wholesale, $/kW/mo — Collecting

· · ·

Retail rack, $/mo — Collecting

· · ·

Year on year

$0.063

Commercial power, $/kWh

Q3 2026 · · H2 2025 – Q2 2026 · 2 AI-ready · 978+ MW · sources

How this market compares

Market$/kW/mo$/kWhfacilitiesRound-trip
Batam, Indonesia· · ·$0.0634
Singapore$403$0.27049
Malaysia· · ·$0.13564
Vietnam· · ·$0.08037

Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index

Why prices sit where they do

Batam is a land-and-power play across the strait from Singapore, and the catalog numbers state it plainly: 882 MW recorded across three facilities, one of them operating. That is the highest planned capacity per site of any city here — more than the 720 MW spread across twelve facilities in Cyberjaya — and it comes from a single group, with DayOne behind all three entries. The economics are the tariff gap, Indonesian power at $0.070/kWh against Singapore's $0.262, on land Singapore does not have. What is sold here is not retail colocation. Two of the three sites are classed AI-ready, none carries Tier III or IV certification, and the product is megawatt blocks leased long and priced per megawatt. For a buyer that means minimal competitive tension, since one operator group covers the market, and diligence should centre on the energisation schedule and on the cost and resilience of the cross-border link back to Singapore.

Frequently asked questions

How much does colocation cost in Batam, Indonesia?

No published wholesale $/kW benchmark exists for Batam, Indonesia yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 4 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.

Why is colocation priced the way it is in Batam, Indonesia?

Commercial electricity in Batam, Indonesia is $0.063 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 4 facilities in our catalog, 3 of them announced or under construction.

Where is colocation cheaper near Batam, Indonesia?

Batam, Indonesia sits at the cheaper end of its regional cluster on the inputs we can verify. The table below compares neighbouring hubs on power tariff, facility count and round-trip time.

Download this market (CSV)

Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.

CSV

Full Batam, Indonesia market report

Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.

We reply within one business day. No spam, no reselling your contacts.

Fitting out a facility? Racks, PDUs, containment and cooling sourced factory-direct from China — The Dream View Co., the team behind Coloprice.

Data centers

FacilityOperatorPower, MWTierStatus
DayOne Nongsa Digital Park Campus (NDP1, ex-GDS Batam)DayOne72Operational
Firmus x Nvidia Batam AI Factory CampusFirmus Technologies / DayOne360Announced
DayOne Kabil Industrial Tech Park (KITP)DayOne Data Centers450Under construction
PDG BT1 BatamPrinceton Digital Group96Under construction

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.