1 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data centers in Kota Kediri: 1 facilities, colocation pricing
How many data centers are in Kota Kediri?
Coloprice tracks 1 data centers in Kota Kediri, Indonesia: 1 operational, 0 under construction and 0 announced, run by 1 operators.
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.063
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 0 AI-ready · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| Kota Kediri, Indonesia | · · · | $0.063 | 1 | — |
| Singapore | $403 | $0.270 | 60 | — |
| Malaysia | · · · | $0.135 | 84 | — |
| Vietnam | · · · | $0.080 | 46 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Frequently asked questions
How many data centers are in Kota Kediri?
Coloprice tracks 1 data centers in Kota Kediri, Indonesia: 1 operational, 0 under construction and 0 announced, run by 1 operators.
Which operators run data centers in Kota Kediri?
By number of facilities tracked: PT Dhoho Mitra Abadi (1).
How much does colocation cost in Kota Kediri, Indonesia?
No published wholesale $/kW benchmark exists for Kota Kediri, Indonesia yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 1 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Kota Kediri, Indonesia?
Commercial electricity in Kota Kediri, Indonesia is $0.063 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 1 facilities in our catalog, 0 of them announced or under construction.
Where is colocation cheaper near Kota Kediri, Indonesia?
Kota Kediri, Indonesia sits at the cheaper end of its regional cluster on the inputs we can verify. The table below compares neighbouring hubs on power tariff, facility count and round-trip time.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Kota Kediri, Indonesia market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Data centers
| Facility | Operator | Power, MW | Tier | Status |
|---|---|---|---|---|
| Dhoho Data Center | PT Dhoho Mitra Abadi | — | — | Operational |
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Nearby data center markets
Indonesia
Colocation quotes in Kota Kediri: free, reply within one business day
Get Quotes →