5 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data centers in Yokohama: 5 facilities, colocation pricing
Colocation pricing and providers in Yokohama →
How many data centers are in Yokohama?
Coloprice tracks 5 data centers in Yokohama, Japan: 5 operational, 0 under construction and 0 announced, run by 4 operators.
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.185
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 0 AI-ready · 19+ MW · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| Yokohama, Kanagawa, Japan | · · · | $0.185 | 5 | — |
| South Korea | · · · | $0.118 | 65 | — |
| Singapore | $403 | $0.270 | 62 | — |
| United States | $196 | $0.117 | 1349 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Frequently asked questions
How many data centers are in Yokohama?
Coloprice tracks 5 data centers in Yokohama, Japan: 5 operational, 0 under construction and 0 announced, run by 4 operators.
Which operators run data centers in Yokohama?
By number of facilities tracked: Internet Initiative Japan (IIJ) (2), NTT Communications (NTT DOCOMO BUSINESS) — Nexcenter (1), Digital Edge (1), CTC (ITOCHU Techno-Solutions) (1).
What is the total data center power capacity in Yokohama?
Facilities that publish capacity add up to 19 MW (1 of 5 sites disclose a figure); the largest published site is Digital Edge TYO4/5/6 with 18.5 MW.
How much does colocation cost in Yokohama, Kanagawa, Japan?
No published wholesale $/kW benchmark exists for Yokohama, Kanagawa, Japan yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 5 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Yokohama, Kanagawa, Japan?
Commercial electricity in Yokohama, Kanagawa, Japan is $0.185 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 5 facilities in our catalog, 0 of them announced or under construction.
Where is colocation cheaper near Yokohama, Kanagawa, Japan?
On power alone, South Korea ($0.118/kWh), United States ($0.117/kWh) run below Yokohama, Kanagawa, Japan. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Yokohama, Kanagawa, Japan market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Tokyo (Inzai) vs Yokohama, KanagawaOsaka (Ibaraki) vs Yokohama, KanagawaKasuya, Fukuoka vs Yokohama, Kanagawa
Data centers
| Facility | Operator | Power, MW | Tier | Status |
|---|---|---|---|---|
| Nexcenter Yokohama 1 Data Center | NTT Communications (NTT DOCOMO BUSINESS) — Nexcenter | — | — | Operational |
| IIJ Yokohama 1 (Kohoku) Data Center | Internet Initiative Japan (IIJ) | — | — | Operational |
| IIJ Yokohama 2 (Tsuzuki) Data Center | Internet Initiative Japan (IIJ) | — | — | Operational |
| Digital Edge TYO4/5/6 | Digital Edge | 18.5 | — | Operational |
| CTC Yokohama Computer Center (YCC) | CTC (ITOCHU Techno-Solutions) | — | — | Operational |
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Nearby data center markets
Colocation quotes in Yokohama: free, reply within one business day
Get Quotes →