1 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data centers in Yoshikawa: 1 facilities, colocation pricing
How many data centers are in Yoshikawa?
Coloprice tracks 1 data centers in Yoshikawa, Japan: 0 operational, 1 under construction and 0 announced, run by 1 operators.
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.185
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 1 AI-ready · 80+ MW · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| Yoshikawa (Saitama), Japan | · · · | $0.185 | 1 | — |
| South Korea | · · · | $0.118 | 59 | — |
| Singapore | $403 | $0.270 | 60 | — |
| United States | $196 | $0.117 | 1332 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Frequently asked questions
How many data centers are in Yoshikawa?
Coloprice tracks 1 data centers in Yoshikawa, Japan: 0 operational, 1 under construction and 0 announced, run by 1 operators.
Which operators run data centers in Yoshikawa?
By number of facilities tracked: Colt DCS (1).
What is the total data center power capacity in Yoshikawa?
Facilities that publish capacity add up to 80 MW (1 of 1 sites disclose a figure); the largest published site is Colt Tokyo Yoshikawa Data Centre with 80 MW.
How much does colocation cost in Yoshikawa (Saitama), Japan?
No published wholesale $/kW benchmark exists for Yoshikawa (Saitama), Japan yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 1 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Yoshikawa (Saitama), Japan?
Commercial electricity in Yoshikawa (Saitama), Japan is $0.185 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 1 facilities in our catalog, 1 of them announced or under construction.
Where is colocation cheaper near Yoshikawa (Saitama), Japan?
On power alone, South Korea ($0.118/kWh), United States ($0.117/kWh) run below Yoshikawa (Saitama), Japan. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Yoshikawa (Saitama), Japan market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Data centers
| Facility | Operator | Power, MW | Tier | Status |
|---|---|---|---|---|
| Colt Tokyo Yoshikawa Data Centre | Colt DCS | 80 | — | Under construction |
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Nearby data center markets
Colocation quotes in Yoshikawa: free, reply within one business day
Get Quotes →