AIMS Cyberjaya Block 3

Operational

Jalan Teknokrat 1/2, Cyber 3, Cyberjaya, Selangor, Malaysia

AIMS Cyberjaya Block 3 is a data center in Cyberjaya, Malaysia, operated by AIMS Data Centre, with 12 MW of published IT capacity, currently operational, opened in 2025.

12 MW third block of the AIMS Cyberjaya campus, completed ahead of schedule with the option to deploy liquid cooling.

AIMS Cyberjaya Block 3 — schematic illustration
Schematic illustration based on published specifications, not a photograph · air-cooled · in operation
Operator
AIMS Data Centre
City
Cyberjaya, Malaysia
Power, MW
12 MW
Cooling
Air
Opened
2025
AI-ready
Yes
E

Coloprice Score

29 out of 100

Class E · #17 of 64 in Malaysia

  • Resilience0/35
  • Compliance0/20
  • Transparency8/20
  • Scale12/15
  • Maturity9/10
How the score is calculated →
Embed score badge
AIMS Cyberjaya Block 3 — Coloprice Score 29
<a href="https://coloprice.com/data-centers/malaysia/cyberjaya/aims-cyberjaya-block-3/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/aims-cyberjaya-block-3.svg"
    alt="AIMS Cyberjaya Block 3 — Coloprice Score 29" height="64">
</a>

Connectivity: 10 networks and 0 internet exchanges are present in this facility. Source: PeeringDB →

Awards & badges

Earned from the rankings — position in the country, city, category and worldwide lists, plus score axes at their maximum. Free to embed on the operator's site; each badge links back to the list that certifies it.

AIMS Cyberjaya Block 3 — Top 25 data centers in Malaysia 2026
#17 of 64 · See the list →
AIMS Cyberjaya Block 3 — Top 10 data centers in Cyberjaya, Malaysia 2026
#8 of 24 · See the list →

Completed in July 2025 ahead of its original schedule, the third block pushes the AIMS Cyberjaya campus toward AI-class workloads. It adds 12 MW of IT load and — unlike its two air-cooled siblings — gives customers the option of deploying a liquid cooling system, positioning it for GPU clusters and other high-density deployments that exceed conventional CRAC-based limits. AIMS attributed the early delivery to accelerated planning and strong customer pre-commitment, and with Block 3 online the operator claims the largest data centre capacity of any provider in Cyberjaya, with total potential capacity across the Klang Valley exceeding 100 MW. Tenants draw on the same ecosystem as the rest of the campus: carrier-neutral interconnection, MyIX reach and direct cloud on-ramps, roughly half an hour from Kuala Lumpur International Airport. Formal certification details for this specific building had not been published at the time of writing.

  • 12 MW IT load, completed July 2025 ahead of schedule
  • Optional liquid cooling for high-density and AI deployments
  • Takes AIMS' Klang Valley potential capacity past 100 MW
  • Part of the carrier-neutral AIMS Cyberjaya campus with cloud on-ramps

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release:

More data centers in Cyberjaya

Source — Verified against operator sources · data pending on-site verification