AIMS Cyberjaya Block 2
OperationalJalan Teknokrat 1/2, Cyber 3, Cyberjaya, Selangor, Malaysia
AIMS Cyberjaya Block 2 is a data center (TIA-942 Rated 3, certified) in Cyberjaya, Malaysia, operated by AIMS Data Centre, with 8 MW of published IT capacity, currently operational, opened in 2024.
Purpose-built second block of the AIMS Cyberjaya campus with a total IT load of 8 MW.

- Operator
- AIMS Data Centre
- City
- Cyberjaya, Malaysia
- Power, MW
- 8 MW
- Cooling
- Air
- TIA-942 Rated
- 3 · certified
- Opened
- 2024
- Max density
- 20 kW/rack
Coloprice Score
51 out of 100
Class C · #4 of 64 in Malaysia
- Resilience20/35
- Compliance0/20
- Transparency11/20
- Scale10/15
- Maturity10/10
Connectivity: 10 networks and 0 internet exchanges are present in this facility. Source: PeeringDB →
Awards & badges
Earned from the rankings — position in the country, city, category and worldwide lists, plus score axes at their maximum. Free to embed on the operator's site; each badge links back to the list that certifies it.
Delivered in just nine months in partnership with Gamuda Engineering, the second building on the AIMS Cyberjaya campus went ready-for-service in 2024 with 8 MW of IT load. It was conceived as the campus's high-density option: rack power reaches up to 20 kW at the top of the range, supported by an air-cooled design that AIMS says holds PUE at 1.5 or below at full load. In December 2024 the building earned ANSI/TIA-942-C Rated 3 Constructed Facility certification from EPI covering levels 1, 4 and 5, valid through 2027. Sitting alongside Block 1 on Jalan Teknokrat 1/2, it inherits the campus's cloud on-ramps, MyIX interconnection and TVRA-grade physical security, while offering newer electrical and mechanical plant. The density ceiling makes it a fit for enterprises consolidating heavier compute footprints — virtualization clusters, private cloud and inference-class GPU nodes — without stepping up to a dedicated liquid-cooled hall.
- ▮8 MW IT load, ready for service in 2024
- ▮Up to 20 kW per rack at the highest range
- ▮PUE of 1.5 or below at full load
- ▮TIA-942 Rated 3 Constructed Facility certified (EPI, Dec 2024)
- ▮Built in nine months with Gamuda Engineering
Colocation pricing: Malaysia & other markets — The Colocation Price Index →
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Customer reviews
No reviews yet
Be the first to review — for current or former customers, work email required.
Write a review
For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.
Operate this facility? Get your free "Listed on Coloprice" badge →
Data release:
More data centers in Cyberjaya
Source — Verified against operator sources · data pending on-site verification