EdgeConneX Cyberjaya Campus

Announced

Cyberjaya, Selangor, Malaysia

EdgeConneX Cyberjaya Campus is a data center in Cyberjaya, Malaysia, operated by EdgeConneX, with 200 MW of published IT capacity, announced, not yet built.

Planned EdgeConneX campus of nine buildings over 30 acres in Cyberjaya with more than 200 MW of capacity.

EdgeConneX Cyberjaya Campus — schematic illustration
Schematic illustration based on published specifications, not a photograph · air-cooled · planned
Operator
EdgeConneX
City
Cyberjaya, Malaysia
Power, MW
200 MW
Cooling
Air
Floor space
200,000 m²
Max density
20 kW/rack
E

Coloprice Score

23 out of 100

Class E · #24 of 64 in Malaysia

  • Resilience0/35
  • Compliance0/20
  • Transparency12/20
  • Scale11/15
  • Maturity0/10
How the score is calculated →
Embed score badge
EdgeConneX Cyberjaya Campus — Coloprice Score 23
<a href="https://coloprice.com/data-centers/malaysia/cyberjaya/edgeconnex-cyberjaya/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/edgeconnex-cyberjaya.svg"
    alt="EdgeConneX Cyberjaya Campus — Coloprice Score 23" height="64">
</a>

Awards & badges

Earned from the rankings — position in the country, city, category and worldwide lists, plus score axes at their maximum. Free to embed on the operator's site; each badge links back to the list that certifies it.

EdgeConneX Cyberjaya Campus — Top 25 data centers in Malaysia 2026
#24 of 64 · See the list →

Nine buildings across a 30-acre estate make the Cyberjaya campus the volume play in EdgeConneX's Malaysian expansion, and by capacity its largest commitment in the country. The operator quotes 67 MW of current capacity scaling beyond 200 MW at full build, backed by a 275 kV substation and around 200,000 sqm of space in Malaysia's established data-center hub southwest of Kuala Lumpur. Construction began in January 2024, with EdgeConneX targeting a fully functional campus within 20 to 24 months of the start. Engineering follows the company's standard Malaysian template: concurrently maintainable power in at least an N+1 configuration, N+1 chilled-water cooling with separate fan-wall and CRAH units, support for cabinet densities up to 20 kW, and carrier-neutral connectivity through diverse fibre conduits and multiple meet-me rooms. Security layering includes mantraps, multi-stage containment, interior security zones, and on-site NOC services, with SOC 2 Type 2, PCI DSS, and ISO 27001 as the stated compliance targets. The multi-building format is pitched at customers with staged, large-scale requirements — from cloud regions to enterprise consolidations — while sustainability work with TNB covers renewable energy supply.

  • Nine-building campus over 30 acres in Cyberjaya
  • 67 MW current capacity, scalable beyond 200 MW
  • 275 kV substation; ~200,000 sqm of space
  • Construction started January 2024, full campus targeted in 20-24 months
  • Up to 20 kW per cabinet on N+1 chilled-water cooling

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release:

More data centers in Cyberjaya

Source — Verified against operator sources · data pending on-site verification