▮▮Coloprice

AIMS Cyberjaya Block 1

Operational

Jalan Teknokrat 1/2, Cyber 3, Cyberjaya, Selangor, Malaysia

AIMS Cyberjaya Block 1 is a data center (Uptime Tier III, certified) in Cyberjaya, Malaysia, operated by AIMS Data Centre, currently operational, opened in 2021.

Purpose-built AIMS data centre launched in Cyberjaya in April 2019 that reached more than 90% occupancy in under a year.

AIMS Cyberjaya Block 1 — schematic illustration
Schematic illustration based on published specifications, not a photograph · air-cooled · in operation
Operator
AIMS Data Centre
City
Cyberjaya, Malaysia
Power, MW
Cooling
Air
Uptime Tier
III · certified
Opened
2021
Uptime Tier IIIISO 27001ISO 9001PCI DSSTVRA
D

Coloprice Score

45 out of 100

Class D · #5 of 64 in Malaysia

  • Resilience20/35
  • Compliance11/20
  • Transparency4/20
  • Scale0/15
  • Maturity10/10
How the score is calculated →
Embed score badge
AIMS Cyberjaya Block 1 — Coloprice Score 45
<a href="https://coloprice.com/data-centers/malaysia/cyberjaya/aims-cyberjaya-block-1/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/aims-cyberjaya-block-1.svg"
    alt="AIMS Cyberjaya Block 1 — Coloprice Score 45" height="64">
</a>

Connectivity: 10 networks and 0 internet exchanges are present in this facility. Source: PeeringDB →

Awards & badges

Earned from the rankings — position in the country, city, category and worldwide lists, plus score axes at their maximum. Free to embed on the operator's site; each badge links back to the list that certifies it.

AIMS Cyberjaya Block 1 — Top 10 data centers in Malaysia 2026
#5 of 64 · See the list →
AIMS Cyberjaya Block 1 — Top 10 data centers in Cyberjaya, Malaysia 2026
#4 of 24 · See the list →

Block 1 anchors AIMS' greenfield campus on Jalan Teknokrat 1/2 in Cyberjaya, a purpose-built hyperscale-grade site whose overall power capacity is scalable to 50 MW. Construction began in Q3 2020 and the first phase entered service in Q2 2021, filling quickly: AIMS reported more than 90% occupancy in under a year. The building carries Uptime Institute Tier III certification for both design documents (April 2020) and the constructed facility (May 2021), and the campus is TVRA-compliant with 24x7 on-site auxiliary police. Connectivity is a differentiator for a Cyberjaya site: tenants get direct on-ramps to Microsoft Azure, AWS and Google Cloud, plus access to the Malaysia Internet Exchange (MyIX), which AIMS operates from its Kuala Lumpur hub. Located in the Multimedia Super Corridor about 30 minutes from KLIA, Block 1 serves enterprises and cloud-adjacent workloads that want certified concurrent maintainability outside the Kuala Lumpur city core.

  • Uptime Tier III certified (design 2020, constructed facility 2021)
  • Campus power scalable to 50 MW
  • Over 90% occupancy within first year of service
  • Direct on-ramps to Azure, AWS and Google Cloud; MyIX access
  • TVRA-compliant with 24x7 on-site auxiliary police

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release:

More data centers in Cyberjaya

Source — Verified against operator sources · data pending on-site verification