Vantage Cyberjaya II Campus

Under construction

Cyberjaya, Selangor

Vantage Cyberjaya II Campus is a data center in Cyberjaya, Malaysia, operated by Vantage Data Centers, with 256 MW of published IT capacity, currently under construction.

Vantage's second Cyberjaya campus, a 256 MW development on which the operator broke ground.

Vantage Cyberjaya II Campus — schematic illustration
Schematic illustration based on published specifications, not a photograph · air-cooled · under construction
Operator
Vantage Data Centers
City
Cyberjaya, Malaysia
Power, MW
256 MW
Cooling
Air
Floor space
445,000 m²
E

Coloprice Score

23 out of 100

Class E · #23 of 64 in Malaysia

  • Resilience0/35
  • Compliance0/20
  • Transparency9/20
  • Scale11/15
  • Maturity3/10
How the score is calculated →
Embed score badge
Vantage Cyberjaya II Campus — Coloprice Score 23
<a href="https://coloprice.com/data-centers/malaysia/cyberjaya/vantage-kul2-cyberjaya-ii/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/vantage-kul2-cyberjaya-ii.svg"
    alt="Vantage Cyberjaya II Campus — Coloprice Score 23" height="64">
</a>

Awards & badges

Earned from the rankings — position in the country, city, category and worldwide lists, plus score axes at their maximum. Free to embed on the operator's site; each badge links back to the list that certifies it.

Vantage Cyberjaya II Campus — Top 25 data centers in Malaysia 2026
#23 of 64 · See the list →
Vantage Cyberjaya II Campus — Top 10 data centers in Cyberjaya, Malaysia 2026
#10 of 24 · See the list →

Ground broke on Cyberjaya II in August 2024 as a 256 MW project, but Vantage has since enlarged the plan: the operator's site now describes a 52-acre (21-hectare) campus delivering 436 MW of critical IT load across six data centres and about 445,000 sqm (4.8 million sq ft) at full development — a different order of magnitude from the 31 MW KUL1 campus a short drive away. Energy comes from Tenaga Nasional Berhad through an on-campus 500 MVA-rated substation on a 275 kV high-voltage connection, with N+1 redundancy across systems. Cooling uses closed-loop chilled water from air-cooled chillers at near-zero water consumption per kW, and the halls are being built liquid-cooling ready for future high-density and AI deployments. Each building gets two meet-me-rooms, with five fibre points of entry serving the carrier-neutral campus. The development forms the core of Vantage's announced USD 3 billion Malaysian investment and targets hyperscale cloud and AI tenants wanting large-block capacity in the Kuala Lumpur metro.

  • Broke ground August 2024; initially announced at 256 MW
  • Full campus plan: 436 MW, six buildings, ~445,000 sqm on 52 acres
  • On-site 500 MVA substation via 275 kV connection from TNB
  • Liquid-cooling ready halls, near-zero water use cooling design
  • Two meet-me-rooms per building, five campus fibre points of entry

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release:

More data centers in Cyberjaya

Source — Verified against operator sources · data pending on-site verification