2 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data centers in Ede: 2 facilities, colocation pricing
How many data centers are in Ede?
Coloprice tracks 2 data centers in Ede, Netherlands: 2 operational, 0 under construction and 0 announced, run by 1 operators.
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.179
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 0 AI-ready · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| Ede, Netherlands | · · · | $0.179 | 2 | — |
| Germany | $250 | $0.269 | 274 | — |
| United Kingdom | $213 | $0.454 | 196 | — |
| France | $190 | $0.173 | 186 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Frequently asked questions
How many data centers are in Ede?
Coloprice tracks 2 data centers in Ede, Netherlands: 2 operational, 0 under construction and 0 announced, run by 1 operators.
Which operators run data centers in Ede?
By number of facilities tracked: BIT (2).
How much does colocation cost in Ede, Netherlands?
No published wholesale $/kW benchmark exists for Ede, Netherlands yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 2 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Ede, Netherlands?
Commercial electricity in Ede, Netherlands is $0.179 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 2 facilities in our catalog, 0 of them announced or under construction.
Where is colocation cheaper near Ede, Netherlands?
On power alone, France ($0.173/kWh) run below Ede, Netherlands. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Ede, Netherlands market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Data centers
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Nearby data center markets
Netherlands
Colocation quotes in Ede: free, reply within one business day
Get Quotes →