7 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data centers in Rotterdam: 7 facilities, colocation pricing
Colocation pricing and providers in Rotterdam →
How many data centers are in Rotterdam?
Coloprice tracks 7 data centers in Rotterdam, Netherlands: 7 operational, 0 under construction and 0 announced, run by 5 operators.
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.179
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 0 AI-ready · 15+ MW · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| Rotterdam, Netherlands | · · · | $0.179 | 7 | — |
| Germany | $250 | $0.269 | 274 | — |
| United Kingdom | $213 | $0.454 | 196 | — |
| France | $190 | $0.173 | 186 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Frequently asked questions
How many data centers are in Rotterdam?
Coloprice tracks 7 data centers in Rotterdam, Netherlands: 7 operational, 0 under construction and 0 announced, run by 5 operators.
Which operators run data centers in Rotterdam?
By number of facilities tracked: NorthC (3), Smartdc (1), TCNPP (1), Eurofiber (1), Cellnex Netherlands (1).
What is the total data center power capacity in Rotterdam?
Facilities that publish capacity add up to 15 MW (3 of 7 sites disclose a figure); the largest published site is NorthC Rotterdam Zestienhoven 1 with 7.3 MW.
How much does colocation cost in Rotterdam, Netherlands?
No published wholesale $/kW benchmark exists for Rotterdam, Netherlands yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 7 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Rotterdam, Netherlands?
Commercial electricity in Rotterdam, Netherlands is $0.179 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 7 facilities in our catalog, 0 of them announced or under construction.
Where is colocation cheaper near Rotterdam, Netherlands?
On power alone, France ($0.173/kWh) run below Rotterdam, Netherlands. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Rotterdam, Netherlands market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Amsterdam vs RotterdamEindhoven vs RotterdamGroningen vs Rotterdam
Data centers
| Facility | Operator | Power, MW | Tier | Status |
|---|---|---|---|---|
| NorthC Rotterdam Waalhaven | NorthC | 0.5 | — | Operational |
| NorthC Rotterdam Zestienhoven 1 | NorthC | 7.3 | — | Operational |
| NorthC Rotterdam Zestienhoven 2 | NorthC | 7.3 | — | Operational |
| Smartdc Rotterdam | Smartdc | — | — | Operational |
| Spaanse Kubus Rotterdam | TCNPP | — | — | Operational |
| Eurofiber Datacenter Rotterdam 2 | Eurofiber | — | — | Operational |
| Cellnex Datacenter Rotterdam | Cellnex Netherlands | — | — | Operational |
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Nearby data center markets
Netherlands
Colocation quotes in Rotterdam: free, reply within one business day
Get Quotes →