1 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data centers in Oude Meer (Amsterdam area): 1 facilities, colocation pricing
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.220
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 0 AI-ready · 5+ MW · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| Oude Meer (Amsterdam area), Netherlands | · · · | $0.220 | 1 | — |
| Germany | · · · | $0.283 | 90 | — |
| United Kingdom | · · · | $0.442 | 81 | — |
| France | · · · | $0.185 | 53 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Frequently asked questions
How much does colocation cost in Oude Meer (Amsterdam area), Netherlands?
No published wholesale $/kW benchmark exists for Oude Meer (Amsterdam area), Netherlands yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 1 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Oude Meer (Amsterdam area), Netherlands?
Commercial electricity in Oude Meer (Amsterdam area), Netherlands is $0.220 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 1 facilities in our catalog, 0 of them announced or under construction.
Where is colocation cheaper near Oude Meer (Amsterdam area), Netherlands?
On power alone, France ($0.185/kWh) run below Oude Meer (Amsterdam area), Netherlands. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Oude Meer (Amsterdam area), Netherlands market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Data centers
| Facility | Operator | Power, MW | Tier | Status |
|---|---|---|---|---|
| NorthC Oude Meer | NorthC | 4.8 | — | Operational |
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.