4 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data centers in Groningen: 4 facilities, colocation pricing
Colocation pricing and providers in Groningen →
How many data centers are in Groningen?
Coloprice tracks 4 data centers in Groningen, Netherlands: 4 operational, 0 under construction and 0 announced, run by 3 operators.
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.179
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 0 AI-ready · 10+ MW · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| Groningen, Netherlands | · · · | $0.179 | 4 | — |
| Germany | $250 | $0.269 | 274 | — |
| United Kingdom | $213 | $0.454 | 196 | — |
| France | $190 | $0.173 | 186 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Frequently asked questions
How many data centers are in Groningen?
Coloprice tracks 4 data centers in Groningen, Netherlands: 4 operational, 0 under construction and 0 announced, run by 3 operators.
Which operators run data centers in Groningen?
By number of facilities tracked: NorthC (2), QTS Data Centers (1), Eurofiber (1).
What is the total data center power capacity in Groningen?
Facilities that publish capacity add up to 10 MW (3 of 4 sites disclose a figure); the largest published site is QTS Groningen Data Center with 4.8 MW.
How much does colocation cost in Groningen, Netherlands?
No published wholesale $/kW benchmark exists for Groningen, Netherlands yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 4 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Groningen, Netherlands?
Commercial electricity in Groningen, Netherlands is $0.179 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 4 facilities in our catalog, 0 of them announced or under construction.
Where is colocation cheaper near Groningen, Netherlands?
On power alone, France ($0.173/kWh) run below Groningen, Netherlands. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Groningen, Netherlands market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Amsterdam vs GroningenGroningen vs RotterdamEindhoven vs Groningen
Data centers
| Facility | Operator | Power, MW | Tier | Status |
|---|---|---|---|---|
| NorthC Groningen 1 | NorthC | 2.7 | — | Operational |
| NorthC Groningen 2 | NorthC | 2.7 | — | Operational |
| QTS Groningen Data Center | QTS Data Centers | 4.8 | — | Operational |
| Eurofiber Datacenter Groningen 1 | Eurofiber | — | — | Operational |
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Nearby data center markets
Netherlands
Colocation quotes in Groningen: free, reply within one business day
Get Quotes →