1 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data centers in Woerden: 1 facilities, colocation pricing
How many data centers are in Woerden?
Coloprice tracks 1 data centers in Woerden, Netherlands: 1 operational, 0 under construction and 0 announced, run by 1 operators.
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.179
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 1 AI-ready · 1+ MW · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| Woerden, Netherlands | · · · | $0.179 | 1 | — |
| Germany | $250 | $0.269 | 274 | — |
| United Kingdom | $213 | $0.454 | 196 | — |
| France | $190 | $0.173 | 186 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Frequently asked questions
How many data centers are in Woerden?
Coloprice tracks 1 data centers in Woerden, Netherlands: 1 operational, 0 under construction and 0 announced, run by 1 operators.
Which operators run data centers in Woerden?
By number of facilities tracked: Switch Datacenters (1).
What is the total data center power capacity in Woerden?
Facilities that publish capacity add up to 1 MW (1 of 1 sites disclose a figure); the largest published site is Switch Datacenters AMS2 with 1 MW.
How much does colocation cost in Woerden, Netherlands?
No published wholesale $/kW benchmark exists for Woerden, Netherlands yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 1 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Woerden, Netherlands?
Commercial electricity in Woerden, Netherlands is $0.179 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 1 facilities in our catalog, 0 of them announced or under construction.
Where is colocation cheaper near Woerden, Netherlands?
On power alone, France ($0.173/kWh) run below Woerden, Netherlands. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Woerden, Netherlands market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Data centers
| Facility | Operator | Power, MW | Tier | Status |
|---|---|---|---|---|
| Switch Datacenters AMS2 | Switch Datacenters | 1 | — | Operational |
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Nearby data center markets
Netherlands
Colocation quotes in Woerden: free, reply within one business day
Get Quotes →