17 facilities · 12 operators · 174 MW tracked
Colocation in Turkey: pricing, providers and markets
12 operators run 17 tracked data centers in Turkey across 1 cities with at least three sites (15 operational, 174+ MW published, 2 AI-ready). Below: the published price benchmark, retail list prices, the operator list and the city pages. Catalog data from primary sources; no estimates.
How much does colocation cost in Turkey?
12 operators run 17 tracked data centers in Turkey; the largest by sites is Turkcell (4). No published wholesale $/kW benchmark exists for this market yet, so Coloprice shows none rather than an estimate. No operator in this market publishes a retail rate card; prices are quoted on request.
Wholesale benchmark
No published wholesale benchmark for this market. Coloprice does not estimate prices; request quotes below.
Published retail prices
No operator in Turkey publishes a retail rate card on its website. That is normal for wholesale-led markets and says nothing about price level — request quotes with one brief.
Colocation providers in Turkey
Operators with tracked data centers in Turkey, sorted by sites, then published capacity. Sites / operational; MW is the sum of what each operator publishes for these sites. Some entries are hyperscaler or enterprise sites that do not sell colocation — check the facility card.
| Operator | Sites / live | Published MW | Top-scored facility | Certifications | AI-ready |
|---|---|---|---|---|---|
| Turkcell | 4 / 4 | 30 | Turkcell Gebze Data Center | Uptime Institute Tier III Certification of Design Documents, Uptime Institute Tier III Certification of Constructed Facility, Uptime Institute Tier III Gold Certification of Operational Sustainability | — |
| Equinix | 2 / 2 | not published | Equinix IL2 | ISO 9001, ISO 14001, ISO 22301 | — |
| Türk Telekom | 2 / 2 | not published | Türk Telekom Esenyurt Data Center | Uptime Institute Tier III Certification of Design Documents, Uptime Institute Tier III Gold Certification of Operational Sustainability, Uptime Institute Tier III Certification of Constructed Facility | — |
| Khazna Data Centers | 1 / 0 | 100 | Khazna Ankara (Başkent OIZ) | not published | — |
| ENKA Data Solutions | 1 / 0 | 20 | ENKA Tuzla Data Center-01 | Uptime Institute Tier III Certification of Design Documents | 1 |
| NGN | 1 / 1 | 16 | Star of Bosphorus İST | Uptime Institute Tier III Certification of Design Documents, Uptime Institute Tier III Certification of Constructed Facility, LEED | — |
| DAMAC Digital (Red Haven Veri Merkezi A.Ş.) | 1 / 1 | 4 | DAMAC Digital IZM-01 | Uptime Institute Tier III Certification of Design Documents, Uptime Institute Tier III Certification of Constructed Facility | 1 |
| Radore Data Center | 1 / 1 | 4 | Radore Levent Data Center | not published | — |
| Datema Bilişim Ticaret A.Ş. (DATACASA) | 1 / 1 | not published | DATACASA DC IST-1 | Uptime Institute Tier III Certification of Design Documents | — |
| Telehouse (Teknotel JV) | 1 / 1 | not published | Telehouse Istanbul | ISO/IEC 27001 | — |
| TurkNet | 1 / 1 | not published | TurkNet Y. Dudullu Data Center | not published | — |
| Vodafone Turkey | 1 / 1 | not published | Vodafone Istanbul Data Center | ANSI/TIA-942-B Constructed Facility, Tier 3 (certificate CAP160322, certified 2022-03-28, expired 2025-03-28) | — |
Colocation markets in Turkey
| City | Sites / live | Published MW |
|---|---|---|
| Colocation in Istanbul | 11 | 40 |
Availability in Turkey: what the numbers do and do not say
Published megawatts describe how facilities are designed, not how much power is available to a new customer today. Vacancy is confirmed only in an operator's proposal for a specific hall and ready-for-service date. Where operators have told Coloprice that a market is sold out to a date, the facility cards say so; otherwise assume nothing and ask each provider the same question.
What the colocation price includes — and what it does not
- Included in the base fee: rack or cabinet space, a committed power circuit, cooling, physical security, and usually a basic remote-hands allowance.
- Billed separately: metered electricity above the allowance (or a per-kWh rate on retail contracts), cross-connects, IP transit, additional remote hands, and one-off setup or installation fees.
- Wholesale contracts add annual escalators, ramp schedules and power-commitment minimums; retail contracts add overage rates and bandwidth caps. Compare providers on the same committed kW, density, term and connectivity.
See also
Weekly digest: price moves, capacity and deals in one email.
FAQ
Who are the largest colocation providers in Turkey?
By tracked sites: Turkcell with 4. By published IT capacity: Khazna Data Centers with 100 MW. Facility counts and MW come from operator pages and registries; the table above lists every operator with a tracked site in Turkey, including some that do not sell space.
Is there colocation capacity available in Turkey right now?
Coloprice tracks 17 facilities here (15 operational, 2 under construction or announced) but does not track vacancy. Availability, rack density and delivery dates are confirmed only in a current proposal for a specific hall — send the same brief to several providers and compare.
How do I get comparable colocation quotes in Turkey?
Send every provider one brief: committed kW, density per rack, redundancy, carriers and cloud on-ramps, start date, term and expansion rights. Ask for space, power, metered electricity, cross-connects, installation and remote hands as separate lines, then compare against the benchmark. The form below routes one brief to matching operators; no operator pays for position.
Get colocation quotes in Turkey
One brief, several operators with capacity in Turkey, same terms. Independent — no operator pays for position.
Colocation in Turkey? One brief, several quotes.
Request quotes →