▮▮Coloprice

17 facilities · 12 operators · 174 MW tracked

Colocation in Turkey: pricing, providers and markets

12 operators run 17 tracked data centers in Turkey across 1 cities with at least three sites (15 operational, 174+ MW published, 2 AI-ready). Below: the published price benchmark, retail list prices, the operator list and the city pages. Catalog data from primary sources; no estimates.

How much does colocation cost in Turkey?

12 operators run 17 tracked data centers in Turkey; the largest by sites is Turkcell (4). No published wholesale $/kW benchmark exists for this market yet, so Coloprice shows none rather than an estimate. No operator in this market publishes a retail rate card; prices are quoted on request.

Wholesale benchmark

No published wholesale benchmark for this market. Coloprice does not estimate prices; request quotes below.

Wholesale $/kW benchmarks by market

Published retail prices

No operator in Turkey publishes a retail rate card on its website. That is normal for wholesale-led markets and says nothing about price level — request quotes with one brief.

Retail rate cards: 1U to full rack

Colocation providers in Turkey

Operators with tracked data centers in Turkey, sorted by sites, then published capacity. Sites / operational; MW is the sum of what each operator publishes for these sites. Some entries are hyperscaler or enterprise sites that do not sell colocation — check the facility card.

OperatorSites / livePublished MWTop-scored facilityCertificationsAI-ready
Turkcell4 / 430Turkcell Gebze Data CenterUptime Institute Tier III Certification of Design Documents, Uptime Institute Tier III Certification of Constructed Facility, Uptime Institute Tier III Gold Certification of Operational Sustainability—
Equinix2 / 2not publishedEquinix IL2ISO 9001, ISO 14001, ISO 22301—
Türk Telekom2 / 2not publishedTürk Telekom Esenyurt Data CenterUptime Institute Tier III Certification of Design Documents, Uptime Institute Tier III Gold Certification of Operational Sustainability, Uptime Institute Tier III Certification of Constructed Facility—
Khazna Data Centers1 / 0100Khazna Ankara (Başkent OIZ)not published—
ENKA Data Solutions1 / 020ENKA Tuzla Data Center-01Uptime Institute Tier III Certification of Design Documents1
NGN1 / 116Star of Bosphorus İSTUptime Institute Tier III Certification of Design Documents, Uptime Institute Tier III Certification of Constructed Facility, LEED—
DAMAC Digital (Red Haven Veri Merkezi A.Ş.)1 / 14DAMAC Digital IZM-01Uptime Institute Tier III Certification of Design Documents, Uptime Institute Tier III Certification of Constructed Facility1
Radore Data Center1 / 14Radore Levent Data Centernot published—
Datema Bilişim Ticaret A.Ş. (DATACASA)1 / 1not publishedDATACASA DC IST-1Uptime Institute Tier III Certification of Design Documents—
Telehouse (Teknotel JV)1 / 1not publishedTelehouse IstanbulISO/IEC 27001—
TurkNet1 / 1not publishedTurkNet Y. Dudullu Data Centernot published—
Vodafone Turkey1 / 1not publishedVodafone Istanbul Data CenterANSI/TIA-942-B Constructed Facility, Tier 3 (certificate CAP160322, certified 2022-03-28, expired 2025-03-28)—

Colocation markets in Turkey

CitySites / livePublished MW
Colocation in Istanbul1140

Availability in Turkey: what the numbers do and do not say

Published megawatts describe how facilities are designed, not how much power is available to a new customer today. Vacancy is confirmed only in an operator's proposal for a specific hall and ready-for-service date. Where operators have told Coloprice that a market is sold out to a date, the facility cards say so; otherwise assume nothing and ask each provider the same question.

What the colocation price includes — and what it does not

  • Included in the base fee: rack or cabinet space, a committed power circuit, cooling, physical security, and usually a basic remote-hands allowance.
  • Billed separately: metered electricity above the allowance (or a per-kWh rate on retail contracts), cross-connects, IP transit, additional remote hands, and one-off setup or installation fees.
  • Wholesale contracts add annual escalators, ramp schedules and power-commitment minimums; retail contracts add overage rates and bandwidth caps. Compare providers on the same committed kW, density, term and connectivity.

Weekly digest: price moves, capacity and deals in one email.

FAQ

Who are the largest colocation providers in Turkey?

By tracked sites: Turkcell with 4. By published IT capacity: Khazna Data Centers with 100 MW. Facility counts and MW come from operator pages and registries; the table above lists every operator with a tracked site in Turkey, including some that do not sell space.

Is there colocation capacity available in Turkey right now?

Coloprice tracks 17 facilities here (15 operational, 2 under construction or announced) but does not track vacancy. Availability, rack density and delivery dates are confirmed only in a current proposal for a specific hall — send the same brief to several providers and compare.

How do I get comparable colocation quotes in Turkey?

Send every provider one brief: committed kW, density per rack, redundancy, carriers and cloud on-ramps, start date, term and expansion rights. Ask for space, power, metered electricity, cross-connects, installation and remote hands as separate lines, then compare against the benchmark. The form below routes one brief to matching operators; no operator pays for position.

Get colocation quotes in Turkey

One brief, several operators with capacity in Turkey, same terms. Independent — no operator pays for position.

We reply within one business day. No spam, no reselling your contacts.