13 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data centers in Adelaide: 13 facilities, colocation pricing
Colocation pricing and providers in Adelaide →
How many data centers are in Adelaide?
Coloprice tracks 13 data centers in Adelaide, Australia: 13 operational, 0 under construction and 0 announced, run by 9 operators.
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.252
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 2 Tier III/IV · 0 AI-ready · 7+ MW · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| Adelaide (CBD), Australia | · · · | $0.252 | 13 | — |
| Singapore | $403 | $0.270 | 60 | — |
| Japan | $280 | $0.185 | 133 | — |
| Indonesia | · · · | $0.063 | 204 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Frequently asked questions
How many data centers are in Adelaide?
Coloprice tracks 13 data centers in Adelaide, Australia: 13 operational, 0 under construction and 0 announced, run by 9 operators.
Which operators run data centers in Adelaide?
By number of facilities tracked: DCI Data Centers (2), Colocity (2), DigiCo REIT (2), Vocus (2), NEXTDC (1).
What is the total data center power capacity in Adelaide?
Facilities that publish capacity add up to 7 MW (3 of 13 sites disclose a figure); the largest published site is NEXTDC A1 Adelaide CBD with 5 MW.
How much does colocation cost in Adelaide (CBD), Australia?
No published wholesale $/kW benchmark exists for Adelaide (CBD), Australia yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 13 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Adelaide (CBD), Australia?
Commercial electricity in Adelaide (CBD), Australia is $0.252 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 13 facilities in our catalog, 0 of them announced or under construction.
Where is colocation cheaper near Adelaide (CBD), Australia?
On power alone, Japan ($0.185/kWh), Indonesia ($0.063/kWh) run below Adelaide (CBD), Australia. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Adelaide (CBD), Australia market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Data centers
| Facility | Operator | Power, MW | Tier | Status |
|---|---|---|---|---|
| NEXTDC A1 Adelaide CBD | NEXTDC | 5 | IV | Operational |
| Adelaide 02 (ADL02) | DCI Data Centers | — | III | Operational |
| YourDC Edinburgh | YourDC | — | — | Operational |
| Equinix AE1 | Equinix | — | — | Operational |
| Colocity DC3 Morphett Street | Colocity | — | — | Operational |
| Colocity DC1 Pulteney Street | Colocity | — | — | Operational |
| DigiCo ADL1 | DigiCo REIT | 1.2 | — | Operational |
| DigiCo ADL2 | DigiCo REIT | 0.6 | — | Operational |
| Adelaide 01 (ADL01) | DCI Data Centers | — | — | Operational |
| Telstra (InfraCo) Waymouth | Telstra InfraCo | — | — | Operational |
| PIPE Networks Adelaide | Vocus | — | — | Operational |
| Primus Adelaide | Vocus | — | — | Operational |
| Kern DC - Adelaide | KernWi-Fi | — | — | Operational |
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Australia
Colocation quotes in Adelaide: free, reply within one business day