3 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data centers in Darwin: 3 facilities, colocation pricing
Colocation pricing and providers in Darwin →
How many data centers are in Darwin?
Coloprice tracks 3 data centers in Darwin, Australia: 2 operational, 0 under construction and 1 announced, run by 2 operators.
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.252
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 1 Tier III/IV · 0 AI-ready · 7+ MW · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| Darwin (CBD), Australia | · · · | $0.252 | 3 | — |
| Singapore | $403 | $0.270 | 60 | — |
| Japan | $280 | $0.185 | 133 | — |
| Indonesia | · · · | $0.063 | 204 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Frequently asked questions
How many data centers are in Darwin?
Coloprice tracks 3 data centers in Darwin, Australia: 2 operational, 0 under construction and 1 announced, run by 2 operators.
Which operators run data centers in Darwin?
By number of facilities tracked: NEXTDC (2), Secure Data Centre (1).
What is the total data center power capacity in Darwin?
Facilities that publish capacity add up to 7 MW (2 of 3 sites disclose a figure); the largest published site is NEXTDC D2 Darwin CBD with 6 MW.
How much does colocation cost in Darwin (CBD), Australia?
No published wholesale $/kW benchmark exists for Darwin (CBD), Australia yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 3 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Darwin (CBD), Australia?
Commercial electricity in Darwin (CBD), Australia is $0.252 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 3 facilities in our catalog, 1 of them announced or under construction.
Where is colocation cheaper near Darwin (CBD), Australia?
On power alone, Japan ($0.185/kWh), Indonesia ($0.063/kWh) run below Darwin (CBD), Australia. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Darwin (CBD), Australia market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Data centers
| Facility | Operator | Power, MW | Tier | Status |
|---|---|---|---|---|
| NEXTDC D1 Darwin CBD | NEXTDC | 1 | IV | Operational |
| NEXTDC D2 Darwin CBD | NEXTDC | 6 | — | Announced |
| Secure Data Centre | Secure Data Centre | — | — | Operational |