2 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data centers in Wagga Wagga: 2 facilities, colocation pricing
How many data centers are in Wagga Wagga?
Coloprice tracks 2 data centers in Wagga Wagga, Australia: 0 operational, 0 under construction and 2 announced, run by 2 operators.
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.252
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 2 AI-ready · 2,300+ MW · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| Wagga Wagga, Australia | · · · | $0.252 | 2 | — |
| Singapore | $403 | $0.270 | 62 | — |
| Japan | $280 | $0.185 | 150 | — |
| Indonesia | · · · | $0.063 | 217 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Frequently asked questions
How many data centers are in Wagga Wagga?
Coloprice tracks 2 data centers in Wagga Wagga, Australia: 0 operational, 0 under construction and 2 announced, run by 2 operators.
Which operators run data centers in Wagga Wagga?
By number of facilities tracked: CDC Data Centres (1), IREN (1).
What is the total data center power capacity in Wagga Wagga?
Facilities that publish capacity add up to 2,300 MW (2 of 2 sites disclose a figure); the largest published site is CDC Wagga Wagga (Gregadoo) with 1400 MW.
How much does colocation cost in Wagga Wagga, Australia?
No published wholesale $/kW benchmark exists for Wagga Wagga, Australia yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 2 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Wagga Wagga, Australia?
Commercial electricity in Wagga Wagga, Australia is $0.252 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 2 facilities in our catalog, 2 of them announced or under construction.
Where is colocation cheaper near Wagga Wagga, Australia?
On power alone, Japan ($0.185/kWh), Indonesia ($0.063/kWh) run below Wagga Wagga, Australia. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Wagga Wagga, Australia market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Data centers
| Facility | Operator | Power, MW | Tier | Status |
|---|---|---|---|---|
| CDC Wagga Wagga (Gregadoo) | CDC Data Centres | 1400 | — | Announced |
| IREN Redbank | IREN | 900 | — | Announced |
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Nearby data center markets
Australia
Colocation quotes in Wagga Wagga: free, reply within one business day
Get Quotes →