▮▮Coloprice
← Australia

2 facilities · Q3 2026 · H2 2025 – Q2 2026 ·

Data centers in Gold Coast: 2 facilities, colocation pricing

How many data centers are in Gold Coast?

Coloprice tracks 2 data centers in Gold Coast, Australia: 1 operational, 0 under construction and 1 announced, run by 2 operators.

· · ·

Average wholesale, $/kW/mo — Collecting

· · ·

Retail rack, $/mo — Collecting

· · ·

Year on year

$0.252

Commercial power, $/kWh

Q3 2026 · · H2 2025 – Q2 2026 · 0 AI-ready · 6+ MW · sources

How this market compares

Market$/kW/mo$/kWhfacilitiesRound-trip
Gold Coast, Australia· · ·$0.2522—
Singapore$403$0.27060—
Japan$280$0.185133—
Indonesia· · ·$0.063204—

Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index

Frequently asked questions

How many data centers are in Gold Coast?

Coloprice tracks 2 data centers in Gold Coast, Australia: 1 operational, 0 under construction and 1 announced, run by 2 operators.

Which operators run data centers in Gold Coast?

By number of facilities tracked: NEXTDC (1), NEXON ASIA PACIFIC (1).

What is the total data center power capacity in Gold Coast?

Facilities that publish capacity add up to 6 MW (1 of 2 sites disclose a figure); the largest published site is NEXTDC GC1 Gold Coast with 6 MW.

How much does colocation cost in Gold Coast, Australia?

No published wholesale $/kW benchmark exists for Gold Coast, Australia yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 2 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.

Why is colocation priced the way it is in Gold Coast, Australia?

Commercial electricity in Gold Coast, Australia is $0.252 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 2 facilities in our catalog, 1 of them announced or under construction.

Where is colocation cheaper near Gold Coast, Australia?

On power alone, Japan ($0.185/kWh), Indonesia ($0.063/kWh) run below Gold Coast, Australia. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.

Download this market (CSV)

Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.

CSV

Full Gold Coast, Australia market report

Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.

We reply within one business day. No spam, no reselling your contacts.

Fitting out a facility? Racks, PDUs, containment and cooling sourced factory-direct from China — The Dream View Co., the team behind Coloprice.

Data centers

FacilityOperatorPower, MWTierStatus
NEXTDC GC1 Gold CoastNEXTDC6—Announced
Nexon Gold Coast DC1NEXON ASIA PACIFIC——Operational

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.