Coloprice Score · methodology 2026.08
Data centers in Cyberjaya, Malaysia: 15 ranked facilities
Cyberjaya has 15 tracked data centers, including 10 operational facilities and 737+ MW of published capacity. This independent ranking separates live enterprise colocation from announced and construction-stage capacity.
Top 15 by Coloprice Score
Who is in this list: Every facility in the catalog located in Cyberjaya, Malaysia — operational, under construction and announced. Status is visible in the maturity axis.
| # | Facility | Operator | MW | Score | Class | Axes |
|---|---|---|---|---|---|---|
| 1 | Vantage Cyberjaya I (KUL1) Campus | Vantage Data Centers | 31 | 58 | C | |
| 2 | NTT Cyberjaya 5 (CBJ5) | NTT Global Data Centers | 6.5 | 53 | C | |
| 3 | AIMS Cyberjaya Block 2 | AIMS Data Centre | 8 | 51 | C | |
| 4 | AIMS Cyberjaya Block 1 | AIMS Data Centre | — | 45 | D | |
| 5 | NTT Cyberjaya 6 (CBJ6) | NTT Global Data Centers | 7 | 33 | E | |
| 6 | AIMS Cyberjaya Block 3 | AIMS Data Centre | 12 | 29 | E | |
| 7 | Bridge Data Centres MY01 | Bridge Data Centres | — | 24 | E | |
| 8 | Vantage Cyberjaya II Campus | Vantage Data Centers | 256 | 23 | E | |
| 9 | EdgeConneX Cyberjaya Campus | EdgeConneX | 200 | 23 | E | |
| 10 | Equinix KL1 | Equinix | — | 23 | E | |
| 11 | Open DC CJ1 | Open DC | — | 23 | E | |
| 12 | STT Kuala Lumpur 1 | STT GDC Malaysia (joint venture with Basis Bay) | 14 | 20 | limited data | |
| 13 | AIMS 200MW AI Data Centre Cyberjaya | AIMS Data Centre | 200 | 17 | limited data | |
| 14 | STT Cyberjaya DC.2 | STT GDC Malaysia (joint venture with Basis Bay) | 2.8 | 16 | limited data | |
| 15 | Bridge Data Centres MY02 | Bridge Data Centres | — | 7 | limited data |
CC BY 4.0 · Coloprice data and compilation: free to reuse under CC BY 4.0 with attribution. Figures credited to third parties remain with their sources. License & attribution
Operators of facilities in this list can embed the award badge («Best data center in Cyberjaya, Malaysia», «Top 10» …) free of charge — it is on the facility page under «Awards & badges» and links back here.
How to choose a Cyberjaya data center
Cyberjaya is Malaysia’s mature enterprise-colocation cluster near Kuala Lumpur. Its live inventory, carrier access and audited facilities suit banks, government-linked companies and regional enterprises that need cabinets or smaller power blocks now, rather than a future hyperscale campus.
The market is changing: 3 facilities are under construction and two announced AI-scale projects materially increase the published pipeline. Compare operational status separately from planned megawatts, and verify the energisation date before treating future capacity as available.
- Confirm whether the quoted hall is operational, commissioned and ready for occupation.
- Check whether Tier language is certified, designed, constructed or only claimed.
- Request one comparable quote covering power, cabinets, cross-connects, setup fees and contract escalation.
- Match the site to the workload: carrier-dense enterprise colocation and AI-scale campuses are different products.
Cyberjaya data center FAQ
How many data centers are in Cyberjaya?
Coloprice tracks 15 data centers in Cyberjaya, Malaysia. 10 are operational, while the remainder are announced or under construction; published capacity totals approximately 737+ MW across facilities that disclose a figure.
Which Cyberjaya data center is best?
The answer depends on the requirement. The Coloprice ranking compares resilience, compliance, transparency, scale and operational maturity from published evidence; buyers should then verify live capacity, connectivity, density and a like-for-like commercial quote.
Is Cyberjaya better than Johor for colocation?
Cyberjaya is generally stronger for mature enterprise colocation and domestic carrier access near Kuala Lumpur. Johor is the newer hyperscale corridor for bulk cloud and AI capacity close to Singapore. The right market depends on scale, latency and delivery timing.
How we ranked them
Coloprice Score is a 0–100 total of five axes: resilience (tier level weighted by the class of evidence, up to 35), compliance (independent audits, up to 20), transparency (how many of seven key fields are published, up to 20), scale (published MW on a log scale plus liquid cooling and AI readiness, up to 15) and maturity (status and age, up to 10). Every input is a field on the facility card, and every card cites its sources.
Nothing here is opinion or paid placement: an operator can only move up by publishing more data or citing more certificates. A dashed class means the operator disclosed too little for a class to be assigned honestly — the score is still computed. Full methodology, class thresholds and the top-50 across all countries: Coloprice Score rankings.
Explore further
Get quotes from these facilities
Tell us the market and capacity — we match your request with operators in this list and return real quotes. Free for buyers.