NTT Cyberjaya 5 (CBJ5)
OperationalNTT Cyberjaya Campus, Cyberjaya, Selangor, Malaysia
NTT Cyberjaya 5 (CBJ5) is a data center (Uptime Tier III, certified) in Cyberjaya, Malaysia, operated by NTT Global Data Centers, with 6.5 MW of published IT capacity, currently operational, opened in 2021.
107,000 sq ft, 6.5 MW critical IT load facility on NTT's Cyberjaya campus, Tier IV-ready with support for racks up to 15 kW.

- Operator
- NTT Global Data Centers
- City
- Cyberjaya, Malaysia
- Power, MW
- 6.5 MW
- Cooling
- Air
- Uptime Tier
- III · certified
- Opened
- 2021
- Floor space
- 9,940 m²
- Max density
- 15 kW/rack
Coloprice Score
53 out of 100
Class C · #3 of 64 in Malaysia
- Resilience20/35
- Compliance0/20
- Transparency14/20
- Scale9/15
- Maturity10/10
Connectivity: 15 networks and 3 internet exchanges are present in this facility. Source: PeeringDB →
Awards & badges
Earned from the rankings — position in the country, city, category and worldwide lists, plus score axes at their maximum. Free to embed on the operator's site; each badge links back to the list that certifies it.
CBJ5, in service since February 2021, was the fifth building on NTT's long-established Cyberjaya campus south of Kuala Lumpur and introduced a cooling-wall system the operator described as a first of its kind for the site, feeding rack densities of up to 15 kW. The compact, modular facility delivers 6.5 MW of critical IT load within about 107,000 sq ft (roughly 9,940 sqm), fed by two 33 kV substations over dual diverse paths. Although engineered to a Tier IV-ready design, the building's formal credentials are Uptime Institute Tier III certifications for both design documents and the constructed facility. Its location matters as much as its plant: NTT routes several of its submarine cable systems through Malaysia, and the Cyberjaya campus serves as a connectivity anchor for those routes. CBJ5 suits enterprises and cloud providers wanting certified resilience in the Klang Valley with room for moderately dense deployments, and it operates in tandem with the newer CBJ6 next door.
- ▮6.5 MW critical IT load, in service since February 2021
- ▮Uptime Tier III certified (design and constructed facility)
- ▮About 107,000 sq ft (~9,940 sqm) with cooling-wall technology
- ▮Rack densities up to 15 kW
- ▮Dual 33 kV substations with diverse power paths
Colocation pricing: Malaysia & other markets — The Colocation Price Index →
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Customer reviews
No reviews yet
Be the first to review — for current or former customers, work email required.
Write a review
For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.
Operate this facility? Get your free "Listed on Coloprice" badge →
Data release:
More data centers in Cyberjaya
Source — Verified against operator sources · data pending on-site verification