▮▮Coloprice

NTT Cyberjaya 6 (CBJ6)

Operational

NTT Cyberjaya Campus, Cyberjaya, Selangor, Malaysia

NTT Cyberjaya 6 (CBJ6) is a data center in Cyberjaya, Malaysia, operated by NTT Global Data Centers, with 7 MW of published IT capacity, currently operational, opened in 2023.

7 MW critical IT load data centre on NTT's Cyberjaya campus, built with an investment of over RM234 million and using cooling-wall technology for racks up to 15 kW.

NTT Cyberjaya 6 (CBJ6) — schematic illustration
Schematic illustration based on published specifications, not a photograph · air-cooled · in operation
Operator
NTT Global Data Centers
City
Cyberjaya, Malaysia
Power, MW
7 MW
Cooling
Air
Opened
2023
Floor space
4,890 m²
Max density
15 kW/rack
E

Coloprice Score

33 out of 100

Class E · #12 of 64 in Malaysia

  • Resilience0/35
  • Compliance0/20
  • Transparency14/20
  • Scale9/15
  • Maturity10/10
How the score is calculated →
Embed score badge
NTT Cyberjaya 6 (CBJ6) — Coloprice Score 33
<a href="https://coloprice.com/data-centers/malaysia/cyberjaya/ntt-cyberjaya-6/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/ntt-cyberjaya-6.svg"
    alt="NTT Cyberjaya 6 (CBJ6) — Coloprice Score 33" height="64">
</a>

Connectivity: 15 networks and 3 internet exchanges are present in this facility. Source: PeeringDB →

Awards & badges

Earned from the rankings — position in the country, city, category and worldwide lists, plus score axes at their maximum. Free to embed on the operator's site; each badge links back to the list that certifies it.

NTT Cyberjaya 6 (CBJ6) — Top 25 data centers in Malaysia 2026
#12 of 64 · See the list →
NTT Cyberjaya 6 (CBJ6) — Top 10 data centers in Cyberjaya, Malaysia 2026
#6 of 24 · See the list →

Launched in October 2023 after a construction start in September 2022, CBJ6 rounded out NTT's Cyberjaya campus as its sixth building, adding 7 MW of critical IT load and about 4,890 sqm of space for an investment of over RM 234 million (around USD 50 million). The engineering mirrors the formula proven in the neighboring CBJ5: advanced cooling-wall technology keeps a stable environment for racks up to 15 kW, and two 33 kV substations provide diverse power reception. Together the two newest buildings give the campus roughly 20,000 sqm of combined space and a 22 MW facility load, making it one of the larger established colocation footprints in Cyberjaya, Malaysia's original data-center district. NTT positions the campus at the crossroads of its submarine cable investments through Malaysia, which appeals to carriers and cloud platforms as well as domestic enterprises. CBJ6 is a fit for organizations that want capacity in the Klang Valley on a mature, multi-building campus rather than a greenfield hyperscale park in Johor.

  • 7 MW critical IT load, launched October 2023
  • About 4,890 sqm of space; racks up to 15 kW via cooling-wall technology
  • Investment of over RM 234 million (~USD 50 million)
  • Two 33 kV substations with diverse power reception
  • Campus with CBJ5 totals ~20,000 sqm and 22 MW facility load

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release:

More data centers in Cyberjaya

Source — Verified against operator sources · data pending on-site verification