▮▮Coloprice

46 facilities · 22 operators · 3,414 MW tracked

Colocation in Sydney: pricing, providers and capacity

22 operators run 46 tracked data centers in Sydney (39 operational, 3,414+ MW published, 9 AI-ready). Below: the published price benchmark for this market, retail list prices where operators publish them, who owns capacity here, and how to get comparable quotes. Catalog data from primary sources; no estimates.

How much does colocation cost in Sydney?

22 operators run 46 tracked data centers in Sydney; the largest by sites is Equinix (8). Wholesale colocation in Sydney is benchmarked at $188 per kW per month (CBRE, Global Data Center Trends 2026 (17 June 2026), H2 2025 – Q2 2026). No operator in this market publishes a retail rate card; prices are quoted on request.

Wholesale benchmark

$188 /kW·mo

Sydney · CBRE, Global Data Center Trends 2026 (17 June 2026) · H2 2025 – Q2 2026

Published average; CBRE reports rents stable year over year

Wholesale $/kW benchmarks by market

Published retail prices

No operator in Sydney publishes a retail rate card on its website. That is normal for wholesale-led markets and says nothing about price level — request quotes with one brief.

Retail rate cards: 1U to full rack

Colocation providers in Sydney

Operators with tracked data centers in Sydney, sorted by sites, then published capacity. Sites / operational; MW is the sum of what each operator publishes for these sites. Some entries are hyperscaler or enterprise sites that do not sell colocation — check the facility card.

OperatorSites / livePublished MWTop-scored facilityCertificationsAI-ready
Equinix8 / 828Equinix SY9xISO 9001, ISO 14001, ISO 223011
NEXTDC7 / 41,135NEXTDC S3 SydneyUptime Institute Tier IV Certification of Constructed Facility, Uptime Institute Tier IV Gold Certification of Operational Sustainability, ISO 90012
Macquarie Data Centres5 / 3267Macquarie IC3 East Macquarie ParkISO 27001, ISO 9001, ISO 140012
CDC Data Centres3 / 2704CDC Eastern Creek CampusAustralian Government Certified Strategic2
AirTrunk3 / 3650AirTrunk SYD2 Sydney NorthAustralian Government Certified Strategic, SCEC Zone 3—
Fujitsu3 / 3100Fujitsu Greystanes Data Centrenot published—
Digital Realty2 / 2not publishedDigital Realty SYD10not published—
STACK Infrastructure1 / 1360STACK SYD01not published—
EdgeConneX1 / 0100EdgeConneX / Stockland MPark Stage 2not published—
DigiCo REIT1 / 136DigiCo SYD1not published—
Telstra InfraCo1 / 120Telstra InfraCo St Leonards Data CentreISO 27001, ISO 14001, ISO 90011
GreenSquareDC1 / 115GreenSquareDC SYD1not published1
5G Networks1 / 1not published5G Networks SDCISO/IEC 27001 Certified Systems—
Datacom Group1 / 1not publishedDatacom@AirTrunk Sydneynot published—
DCI Data Centers1 / 1not publishedSydney 01 (SYD01)ISO 9001, ISO 14001, ISO 27001—
DXN Limited1 / 1not publishedDXN-SYD01Uptime Institute Tier III Certification of Constructed Facility—
FibreconX FibreExchange1 / 1not publishedFibreExchange Sydneynot published—
Interactive1 / 1not publishedInteractive Sydney Data CentreISO 9001, ISO 27001, RE100—
Keppel DC REIT1 / 1not publishedKeppel DC Gore Hill Sydneynot published—
OVHcloud1 / 1not publishedOVHcloud Sydney Campusnot published—
Spectrum Networks1 / 1not publishedSpectrum Networks George Street Data Centernot published—
Vocus1 / 1not publishedPIPE Networks Sydneynot published—

Availability in Sydney: what the numbers do and do not say

Published megawatts describe how facilities are designed, not how much power is available to a new customer today. Vacancy is confirmed only in an operator's proposal for a specific hall and ready-for-service date. Where operators have told Coloprice that a market is sold out to a date, the facility cards say so; otherwise assume nothing and ask each provider the same question.

What the colocation price includes — and what it does not

  • Included in the base fee: rack or cabinet space, a committed power circuit, cooling, physical security, and usually a basic remote-hands allowance.
  • Billed separately: metered electricity above the allowance (or a per-kWh rate on retail contracts), cross-connects, IP transit, additional remote hands, and one-off setup or installation fees.
  • Wholesale contracts add annual escalators, ramp schedules and power-commitment minimums; retail contracts add overage rates and bandwidth caps. Compare providers on the same committed kW, density, term and connectivity.

Weekly digest: price moves, capacity and deals in one email.

FAQ

Who are the largest colocation providers in Sydney?

By tracked sites: Equinix with 8. By published IT capacity: NEXTDC with 1,135 MW. Facility counts and MW come from operator pages and registries; the table above lists every operator with a tracked site in Sydney, including some that do not sell space.

Is there colocation capacity available in Sydney right now?

Coloprice tracks 46 facilities here (39 operational, 7 under construction or announced) but does not track vacancy. Availability, rack density and delivery dates are confirmed only in a current proposal for a specific hall — send the same brief to several providers and compare.

How do I get comparable colocation quotes in Sydney?

Send every provider one brief: committed kW, density per rack, redundancy, carriers and cloud on-ramps, start date, term and expansion rights. Ask for space, power, metered electricity, cross-connects, installation and remote hands as separate lines, then compare against the Sydney benchmark. The form below routes one brief to matching operators; no operator pays for position.

Get colocation quotes in Sydney

One brief, several operators with capacity in Sydney, Australia, same terms. Independent — no operator pays for position.

We reply within one business day. No spam, no reselling your contacts.