68 facilities · 36 operators · 3,826 MW tracked

Colocation in Malaysia: pricing, providers and markets

36 operators run 68 tracked data centers in Malaysia across 6 cities with at least three sites (43 operational, 3,826+ MW published, 21 AI-ready). Below: the published price benchmark, retail list prices, the operator list and the city pages. Catalog data from primary sources; no estimates.

How much does colocation cost in Malaysia?

36 operators run 68 tracked data centers in Malaysia; the largest by sites is AIMS Data Centre (7). No published wholesale $/kW benchmark exists for this market yet, so Coloprice shows none rather than an estimate. No operator in this market publishes a retail rate card; prices are quoted on request.

Wholesale benchmark

No published wholesale benchmark for this market. Coloprice does not estimate prices; request quotes below.

Wholesale $/kW benchmarks by market

Published retail prices

No operator in Malaysia publishes a retail rate card on its website. That is normal for wholesale-led markets and says nothing about price level — request quotes with one brief.

Retail rate cards: 1U to full rack

Colocation providers in Malaysia

Operators with tracked data centers in Malaysia, sorted by sites, then published capacity. Sites / operational; MW is the sum of what each operator publishes for these sites. Some entries are hyperscaler or enterprise sites that do not sell colocation — check the facility card.

OperatorSites / livePublished MWTop-scored facilityCertificationsAI-ready
AIMS Data Centre7 / 6228AIMS Cyberjaya Block 2ISO 9001, PCI DSS, Uptime Tier III2
Bridge Data Centres5 / 3not publishedBridge Data Centres MY01PCI DSS, SOC 2—
Open DC4 / 45Open DC JB2ISO 27001, ISO 9001, PCI DSS1
Equinix4 / 2not publishedEquinix KL1not published2
Vantage Data Centers3 / 2587Vantage Cyberjaya I (KUL1) CampusUptime Tier III, ISO 9001, ISO 270011
AirTrunk3 / 2550AirTrunk JHB2not published2
EdgeConneX3 / 0289EdgeConneX Bukit Jalilnot published1
STT GDC Malaysia (joint venture with Basis Bay)3 / 033STT Johor 1not published1
NTT Global Data Centers3 / 314NTT Cyberjaya 5 (CBJ5)Uptime Tier III, ANSI/TIA-942-C Facility - Rated 3—
YTL Data Center Holdings2 / 1505YTL Green Data Center Parknot published1
Princeton Digital Group2 / 1500PDG JH1not published2
Basis Bay2 / 2not publishedBasis Bay Glenmarie Data CenterANSI/TIA-942-B Facility - Rated 3, ANSI/TIA-942-A Facility - Rated 2—
CSF Group2 / 2not publishedCSF CX5not published—
Digital Realty2 / 2not publishedDigital Realty KUL10not published—
TM Global (Telekom Malaysia)2 / 2not publishedTM Global Klang Valley Data Centre (KVDC)Uptime Institute Tier III Certification of Design Documents, Uptime Institute Tier III Certification of Constructed Facility, Uptime Institute Tier III (TM states its Malaysian data centres meet Tier III)—
STACK Infrastructure1 / 1216STACK Johor Bahru Campusnot published—
Empyrion Digital1 / 0200Empyrion MY1 Johor Data Centre Campusnot published1
TM Nxera (Telekom Malaysia / Nxera-Singtel JV)1 / 0200TM Nxera Data Centre Campus — Iskandar Puterinot published1
GDS Holdings / YTL Power1 / 0168GDS at YTL Green Data Center Parknot published—
Bitdeer AI (Bitdeer Technologies Group)1 / 065Bitdeer AI A202 (Johor Campus)not published1
NEXTDC1 / 165NEXTDC KL1Uptime Institute Tier IV Certification of Design Documents, Uptime Institute Tier IV Certification of Constructed Facility1
Epoch Digital (Actis)1 / 060Epoch Digital Nusajaya Tech Park (Project Mercury)not published1
GDS Holdings1 / 154GDS Nusajaya Tech Park Data Center Campusnot published—
Pi Data Centre (PiDC Holdings / Jakel Group)1 / 051Pi DC1Uptime Institute Tier III Certification of Design Documents—
FutureData Sdn Bhd (TSG Group / Cyclect)1 / 017FutureData Park, first data center (Global Telecommunications Group)not published1
Exsim Jalil Link Sdn. Bhd. (Exsim Group)1 / 015EXSIM EX1 Data Centernot published—
Strateq Group1 / 15Strateq Data Centre (DC-2)Uptime Institute Tier III Certification of Design Documents—
DUG Technology1 / 1not publishedDUG Kuala Lumpur Data Centrenot published1
Global Switch1 / 0not publishedGlobal Switch Johornot published—
Google1 / 0not publishedGoogle Elmina Data Centernot published1
HDC Data Centre Sdn. Bhd.1 / 1not publishedHDC Data CentreUptime Institute Tier III Certification (first in Malaysia, since 2012)—
irix1 / 1not publishedirix Kuching 1 DC @SantubongUptime Institute Tier IV Certification of Design Documents, Uptime Institute Tier IV Certification of Constructed Facility—
MYTelehaus1 / 1not publishedMyTelehaus CJ1 CentreANSI/TIA-942-A Facility - Rated 3—
TM ONE (Telekom Malaysia)1 / 1not publishedTM ONE Iskandar Puteri Core Data Centre (IPDC)Uptime Institute Tier III Certification of Design Documents, Uptime Institute Tier III Certification of Constructed Facility—
TM ONE (TM Technology Services / Telekom Malaysia)1 / 1not publishedTM ONE Kelana Jaya Data Centrenot published—
TM ONE (VADS Berhad / Telekom Malaysia)1 / 1not publishedTM ONE VADS Brickfields City Data Centrenot published—

Colocation markets in Malaysia

Availability in Malaysia: what the numbers do and do not say

Published megawatts describe how facilities are designed, not how much power is available to a new customer today. Vacancy is confirmed only in an operator's proposal for a specific hall and ready-for-service date. Where operators have told Coloprice that a market is sold out to a date, the facility cards say so; otherwise assume nothing and ask each provider the same question.

What the colocation price includes — and what it does not

  • Included in the base fee: rack or cabinet space, a committed power circuit, cooling, physical security, and usually a basic remote-hands allowance.
  • Billed separately: metered electricity above the allowance (or a per-kWh rate on retail contracts), cross-connects, IP transit, additional remote hands, and one-off setup or installation fees.
  • Wholesale contracts add annual escalators, ramp schedules and power-commitment minimums; retail contracts add overage rates and bandwidth caps. Compare providers on the same committed kW, density, term and connectivity.

Weekly digest: price moves, capacity and deals in one email.

FAQ

Who are the largest colocation providers in Malaysia?

By tracked sites: AIMS Data Centre with 7. By published IT capacity: Vantage Data Centers with 587 MW. Facility counts and MW come from operator pages and registries; the table above lists every operator with a tracked site in Malaysia, including some that do not sell space.

Is there colocation capacity available in Malaysia right now?

Coloprice tracks 68 facilities here (43 operational, 25 under construction or announced) but does not track vacancy. Availability, rack density and delivery dates are confirmed only in a current proposal for a specific hall — send the same brief to several providers and compare.

How do I get comparable colocation quotes in Malaysia?

Send every provider one brief: committed kW, density per rack, redundancy, carriers and cloud on-ramps, start date, term and expansion rights. Ask for space, power, metered electricity, cross-connects, installation and remote hands as separate lines, then compare against the benchmark. The form below routes one brief to matching operators; no operator pays for position.

Get colocation quotes in Malaysia

One brief, several operators with capacity in Malaysia, same terms. Independent — no operator pays for position.

We reply within one business day. No spam, no reselling your contacts.