93 facilities · 45 operators · 4,326 MW tracked
Colocation in Malaysia: pricing, providers and markets
45 operators run 93 tracked data centers in Malaysia across 7 cities with at least three sites (61 operational, 4,326+ MW published, 26 AI-ready). Below: the published price benchmark, retail list prices, the operator list and the city pages. Catalog data from primary sources; no estimates.
How much does colocation cost in Malaysia?
45 operators run 93 tracked data centers in Malaysia; the largest by sites is AIMS Data Centre (7). No published wholesale $/kW benchmark exists for this market yet, so Coloprice shows none rather than an estimate. Published retail list prices in this market start at MYR 300 (1U colocation, iCore Technology). 4 operators publish rate cards here.
Wholesale benchmark
No published wholesale benchmark for this market. Coloprice does not estimate prices; request quotes below.
Published retail prices
- MYR 381.15 — 1U rack mount, Exabytes Malaysia (Kuala Lumpur / Cyberjaya; 1 power point (kW not stated))
- MYR 300 — 1U colocation, iCore Technology (Cyberjaya (CJ1); 100 W)
- MYR 370 — 1U rack, GB Network Solutions (Cyberjaya (CJ1); 0.1 kW, 1 power point)
- MYR 395 — Single U, TheGigabit (Kuala Lumpur (AIMS); 0.10 kVA, 1 socket)
Colocation providers in Malaysia
Operators with tracked data centers in Malaysia, sorted by sites, then published capacity. Sites / operational; MW is the sum of what each operator publishes for these sites. Some entries are hyperscaler or enterprise sites that do not sell colocation — check the facility card.
| Operator | Sites / live | Published MW | Top-scored facility | Certifications | AI-ready |
|---|---|---|---|---|---|
| AIMS Data Centre | 7 / 6 | 228 | AIMS Cyberjaya Block 2 | ISO 9001, PCI DSS, Uptime Tier III | 2 |
| Open DC | 5 / 5 | 5 | Open DC JB2 | ISO 27001, ISO 9001, PCI DSS | 1 |
| Bridge Data Centres | 5 / 3 | not published | Bridge Data Centres MY01 | PCI DSS, SOC 2 | — |
| 5 / 1 | not published | Google Elmina Data Center | not published | 2 | |
| Vantage Data Centers | 4 / 3 | 587 | Vantage Cyberjaya I (KUL1) Campus | Uptime Tier III, ISO 9001, ISO 27001 | 1 |
| NTT Global Data Centers | 4 / 4 | 14 | NTT Cyberjaya 5 (CBJ5) | Uptime Tier III, ANSI/TIA-942-C Facility - Rated 3, ANSI/TIA-942-C Rated 3 (Constructed Facility) | — |
| Equinix | 4 / 2 | not published | Equinix KL1 | not published | 2 |
| AirTrunk | 3 / 2 | 550 | AirTrunk JHB2 | not published | 2 |
| Racks Central | 3 / 0 | 440 | Racks Central RCJM1 | not published | 3 |
| EdgeConneX | 3 / 0 | 289 | EdgeConneX Bukit Jalil | not published | 1 |
| STT GDC Malaysia (joint venture with Basis Bay) | 3 / 0 | 33 | STT Johor 1 | not published | 1 |
| Basis Bay | 3 / 3 | not published | Basis Bay Cyberjaya Data Centre 2 | ANSI/TIA-942-B Facility - Rated 3, ANSI/TIA-942-A Facility - Rated 2, ANSI/TIA-942-C Rated 4 (Constructed Facility) | — |
| Telekom Malaysia Berhad (TM) | 3 / 3 | not published | Telekom Malaysia Bhd TM ONE Iskandar Puteri Core Data Center | Uptime Institute Tier III Certification of Design Documents, Uptime Institute Tier III Certification of Constructed Facility | — |
| TM ONE (Telekom Malaysia) | 3 / 3 | not published | TM ONE Iskandar Puteri Core Data Centre (IPDC) | ANSI/TIA-942-C Rated 3 (Constructed Facility), Uptime Institute Tier III Certification of Design Documents, Uptime Institute Tier III Certification of Constructed Facility | — |
| YTL Data Center Holdings | 2 / 1 | 505 | YTL Green Data Center Park | not published | 1 |
| Princeton Digital Group | 2 / 1 | 500 | PDG JH1 | not published | 2 |
| Bitdeer AI (Bitdeer Technologies Group) | 2 / 0 | 125 | Bitdeer AI A202 (Johor Campus) | not published | 2 |
| Bank Negara Malaysia | 2 / 2 | not published | Bank Negara Malaysia Data Centre Cyberjaya (DCC) | ANSI/TIA-942-B Rated 3 (Constructed Facility) | — |
| CSF Group | 2 / 2 | not published | CSF CX5 | not published | — |
| Digital Realty | 2 / 2 | not published | Digital Realty KUL10 | not published | — |
| TM Global (Telekom Malaysia) | 2 / 2 | not published | TM Global Klang Valley Data Centre (KVDC) | Uptime Institute Tier III Certification of Design Documents, Uptime Institute Tier III Certification of Constructed Facility, Uptime Institute Tier III (TM states its Malaysian data centres meet Tier III) | — |
| STACK Infrastructure | 1 / 1 | 216 | STACK Johor Bahru Campus | not published | — |
| Empyrion Digital | 1 / 0 | 200 | Empyrion MY1 Johor Data Centre Campus | not published | 1 |
| TM Nxera (Telekom Malaysia / Nxera-Singtel JV) | 1 / 0 | 200 | TM Nxera Data Centre Campus — Iskandar Puteri | not published | 1 |
| GDS Holdings / YTL Power | 1 / 0 | 168 | GDS at YTL Green Data Center Park | not published | — |
| NEXTDC | 1 / 1 | 65 | NEXTDC KL1 | Uptime Institute Tier IV Certification of Design Documents, Uptime Institute Tier IV Certification of Constructed Facility | 1 |
| Epoch Digital (Actis) | 1 / 0 | 60 | Epoch Digital Nusajaya Tech Park (Project Mercury) | not published | 1 |
| GDS Holdings | 1 / 1 | 54 | GDS Nusajaya Tech Park Data Center Campus | not published | — |
| Pi Data Centre (PiDC Holdings / Jakel Group) | 1 / 0 | 51 | Pi DC1 | Uptime Institute Tier III Certification of Design Documents | — |
| FutureData Sdn Bhd (TSG Group / Cyclect) | 1 / 0 | 17 | FutureData Park, first data center (Global Telecommunications Group) | not published | 1 |
| Exsim Jalil Link Sdn. Bhd. (Exsim Group) | 1 / 0 | 15 | EXSIM EX1 Data Center | not published | — |
| Strateq Group | 1 / 1 | 5 | Strateq Data Centre (DC-2) | Uptime Institute Tier III Certification of Design Documents, ISO 27001, PCI DSS | — |
| Bank Simpanan Nasional | 1 / 1 | not published | Bank Simpanan Nasional Data Center BSN, Block C | ANSI/TIA-942-B Rated 3 (Constructed Facility) | — |
| DUG Technology | 1 / 1 | not published | DUG Kuala Lumpur Data Centre | not published | 1 |
| Global Switch | 1 / 0 | not published | Global Switch Johor | not published | — |
| HDC Data Centre Sdn. Bhd. | 1 / 1 | not published | HDC Data Centre | Uptime Institute Tier III Certification (first in Malaysia, since 2012) | — |
| HeiTech Padu Berhad | 1 / 1 | not published | HeiTech Village 2 Data Centre | ANSI/TIA-942-B Rated 3 (Constructed Facility) | — |
| irix | 1 / 1 | not published | irix Kuching 1 DC @Santubong | Uptime Institute Tier IV Certification of Design Documents, Uptime Institute Tier IV Certification of Constructed Facility | — |
| Malaysian Communications & Multimedia Commission | 1 / 1 | not published | Malaysian Communications & Multimedia Commission MCMC Data Centre | Uptime Institute Tier III Certification of Design Documents, Uptime Institute Tier III Certification of Constructed Facility | — |
| MYTelehaus | 1 / 1 | not published | MyTelehaus CJ1 Centre | ANSI/TIA-942-A Facility - Rated 3 | — |
| Payments Network Malaysia Sdn Bhd (PayNet) | 1 / 1 | not published | Payments Network Malaysia Sdn Bhd (PayNet) PayNet Bangsar South Data Centre (BGR) | ANSI/TIA-942-B Rated 3 (Constructed Facility) | — |
| PLTPRO Data Centre Sdn Bhd | 1 / 1 | not published | PLTPRO Data Centre | not published | — |
| RHB Complex Bangi (IT & Training Centre) | 1 / 1 | not published | RHB Complex Bangi (IT & Training Centre) Data Center Level 2 & Level 3 | ANSI/TIA-942-C Rated 3 (Constructed Facility) | — |
| TM Technology Services | 1 / 1 | not published | TM Technology Services Klang Valley Data Centre Block 2, Ph1, Suites 2-101 & 2-102 | Uptime Institute Tier III Certification of Constructed Facility, Uptime Institute Tier III Certification of Design Documents | — |
| YTL DC South | 1 / 1 | not published | YTL JDC1, South Wing Ground Floor, Phase 1 | Uptime Institute Tier III Certification of Design Documents Tier III Certification of Constructed Facility | — |
Colocation markets in Malaysia
| City | Sites / live | Published MW |
|---|---|---|
| Colocation in Cyberjaya | 32 | 848 |
| Colocation in Kuala Lumpur | 12 | 182 |
| Colocation in Johor Bahru | 11 | 1,051 |
| Colocation in Iskandar Puteri | 9 | 750 |
| Colocation in Kulai | 7 | 1,468 |
| Colocation in Shah Alam | 5 | 5 |
| Colocation in Penang | 3 | not published |
Availability in Malaysia: what the numbers do and do not say
Published megawatts describe how facilities are designed, not how much power is available to a new customer today. Vacancy is confirmed only in an operator's proposal for a specific hall and ready-for-service date. Where operators have told Coloprice that a market is sold out to a date, the facility cards say so; otherwise assume nothing and ask each provider the same question.
What the colocation price includes — and what it does not
- Included in the base fee: rack or cabinet space, a committed power circuit, cooling, physical security, and usually a basic remote-hands allowance.
- Billed separately: metered electricity above the allowance (or a per-kWh rate on retail contracts), cross-connects, IP transit, additional remote hands, and one-off setup or installation fees.
- Wholesale contracts add annual escalators, ramp schedules and power-commitment minimums; retail contracts add overage rates and bandwidth caps. Compare providers on the same committed kW, density, term and connectivity.
See also
Weekly digest: price moves, capacity and deals in one email.
FAQ
Who are the largest colocation providers in Malaysia?
By tracked sites: AIMS Data Centre with 7. By published IT capacity: Vantage Data Centers with 587 MW. Facility counts and MW come from operator pages and registries; the table above lists every operator with a tracked site in Malaysia, including some that do not sell space.
Is there colocation capacity available in Malaysia right now?
Coloprice tracks 93 facilities here (61 operational, 32 under construction or announced) but does not track vacancy. Availability, rack density and delivery dates are confirmed only in a current proposal for a specific hall — send the same brief to several providers and compare.
How do I get comparable colocation quotes in Malaysia?
Send every provider one brief: committed kW, density per rack, redundancy, carriers and cloud on-ramps, start date, term and expansion rights. Ask for space, power, metered electricity, cross-connects, installation and remote hands as separate lines, then compare against the benchmark. The form below routes one brief to matching operators; no operator pays for position.
Get colocation quotes in Malaysia
One brief, several operators with capacity in Malaysia, same terms. Independent — no operator pays for position.
Colocation in Malaysia? One brief, several quotes.
Request quotes →