8 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data centers in Hillsboro: 8 facilities, colocation pricing
Colocation pricing and providers in Hillsboro →
How many data centers are in Hillsboro?
Coloprice tracks 8 data centers in Hillsboro, United States: 7 operational, 1 under construction and 0 announced, run by 6 operators.
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.117
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 2 Tier III/IV · 0 AI-ready · 27+ MW · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| Hillsboro, United States | · · · | $0.117 | 8 | — |
| Germany | $250 | $0.269 | 274 | — |
| United Kingdom | $213 | $0.454 | 199 | — |
| Japan | $280 | $0.185 | 145 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Frequently asked questions
How many data centers are in Hillsboro?
Coloprice tracks 8 data centers in Hillsboro, United States: 7 operational, 1 under construction and 0 announced, run by 6 operators.
Which operators run data centers in Hillsboro?
By number of facilities tracked: EdgeConneX (3), Opus Interactive (1), Hetzner Online (1), OVHcloud (1), Digital Realty (1).
What is the total data center power capacity in Hillsboro?
Facilities that publish capacity add up to 27 MW (2 of 8 sites disclose a figure); the largest published site is Opus Interactive — Opus West with 24 MW.
How much does colocation cost in Hillsboro, United States?
No published wholesale $/kW benchmark exists for Hillsboro, United States yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 8 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Hillsboro, United States?
Commercial electricity in Hillsboro, United States is $0.117 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 8 facilities in our catalog, 1 of them announced or under construction.
Where is colocation cheaper near Hillsboro, United States?
Hillsboro, United States sits at the cheaper end of its regional cluster on the inputs we can verify. The table below compares neighbouring hubs on power tariff, facility count and round-trip time.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Hillsboro, United States market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Data centers
| Facility | Operator | Power, MW | Tier | Status |
|---|---|---|---|---|
| Opus Interactive — Opus West | Opus Interactive | 24 | — | Operational |
| Hetzner Datacenter Hillsboro | Hetzner Online | — | — | Operational |
| EdgeConneX POR01 | EdgeConneX | — | — | Operational |
| EdgeConneX POR02 | EdgeConneX | 3 | — | Operational |
| EdgeConneX POR03 | EdgeConneX | — | — | Under construction |
| OVHcloud Hillsboro Campus | OVHcloud | — | — | Operational |
| Digital Realty PDX11 Data Center, Suite 220 | Digital Realty | — | III | Operational |
| Flexential – Brookwood Phase One | Flexential | — | III | Operational |
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Nearby data center markets