5 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data centers in Red Oak: 5 facilities, colocation pricing
Colocation pricing and providers in Red Oak →
How many data centers are in Red Oak?
Coloprice tracks 5 data centers in Red Oak, United States: 4 operational, 1 under construction and 0 announced, run by 2 operators.
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.117
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 1 AI-ready · 600+ MW · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| Red Oak, TX, United States | · · · | $0.117 | 5 | — |
| Germany | $250 | $0.269 | 274 | — |
| United Kingdom | $213 | $0.454 | 196 | — |
| Japan | $280 | $0.185 | 133 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Frequently asked questions
How many data centers are in Red Oak?
Coloprice tracks 5 data centers in Red Oak, United States: 4 operational, 1 under construction and 0 announced, run by 2 operators.
Which operators run data centers in Red Oak?
By number of facilities tracked: DataBank (4), Compass Datacenters (1).
What is the total data center power capacity in Red Oak?
Facilities that publish capacity add up to 600 MW (5 of 5 sites disclose a figure); the largest published site is Compass Red Oak Campus with 360 MW.
How much does colocation cost in Red Oak, TX, United States?
No published wholesale $/kW benchmark exists for Red Oak, TX, United States yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 5 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Red Oak, TX, United States?
Commercial electricity in Red Oak, TX, United States is $0.117 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 5 facilities in our catalog, 1 of them announced or under construction.
Where is colocation cheaper near Red Oak, TX, United States?
Red Oak, TX, United States sits at the cheaper end of its regional cluster on the inputs we can verify. The table below compares neighbouring hubs on power tariff, facility count and round-trip time.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Red Oak, TX, United States market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Data centers
| Facility | Operator | Power, MW | Tier | Status |
|---|---|---|---|---|
| Compass Red Oak Campus | Compass Datacenters | 360 | — | Under construction |
| DataBank DFW10 | DataBank | 60 | — | Operational |
| DataBank DFW11 | DataBank | 60 | — | Operational |
| DataBank DFW12 | DataBank | 60 | — | Operational |
| DataBank DFW9 | DataBank | 60 | — | Operational |
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Nearby data center markets
United States
Colocation quotes in Red Oak: free, reply within one business day
Get Quotes →