21 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data centers in Santa Clara: 21 facilities, colocation pricing
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.109
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 5 AI-ready · 423+ MW · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| Santa Clara, United States | · · · | $0.109 | 21 | — |
| Germany | · · · | $0.283 | 90 | — |
| United Kingdom | · · · | $0.442 | 81 | — |
| Japan | · · · | $0.201 | 68 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Frequently asked questions
How much does colocation cost in Santa Clara, United States?
No published wholesale $/kW benchmark exists for Santa Clara, United States yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 21 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Santa Clara, United States?
Commercial electricity in Santa Clara, United States is $0.109 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 21 facilities in our catalog, 1 of them announced or under construction.
Where is colocation cheaper near Santa Clara, United States?
Santa Clara, United States sits at the cheaper end of its regional cluster on the inputs we can verify. The table below compares neighbouring hubs on power tariff, facility count and round-trip time.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Santa Clara, United States market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Data centers
| Facility | Operator | Power, MW | Tier | Status |
|---|---|---|---|---|
| Equinix SV2 | Equinix | — | — | Operational |
| Equinix SV14 | Equinix | — | — | Operational |
| Equinix SV15 | Equinix | — | — | Operational |
| Equinix SV16 | Equinix | — | — | Operational |
| NTT Silicon Valley SV1 Data Center | NTT Global Data Centers | 16 | — | Operational |
| QTS Santa Clara 1 | QTS Data Centers | 7.5 | — | Operational |
| Vantage Santa Clara I Campus (CA1) | Vantage Data Centers | 77 | — | Operational |
| Vantage Santa Clara II Campus (CA2) | Vantage Data Centers | 75 | — | Operational |
| Vantage Santa Clara III Campus (CA3) | Vantage Data Centers | 64 | — | Under construction |
| STACK SVY02 | STACK Infrastructure | 48 | — | Operational |
| Cologix SV1 | Cologix | — | — | Operational |
| DataBank SFO1 | DataBank | 3 | — | Operational |
| Csquare SFO2 | Csquare | 43.2 | — | Operational |
| Csquare SFO4 | Csquare | 43.1 | — | Operational |
| Csquare SFO1 | Csquare | 34.5 | — | Operational |
| CoreSite SV4 | CoreSite | — | — | Operational |
| CoreSite SV7 | CoreSite | — | — | Operational |
| CoreSite SV8 | CoreSite | — | — | Operational |
| CoreSite SV9 | CoreSite | — | — | Operational |
| Colovore SJC01 | Colovore | 6 | — | Operational |
| Colovore SJC02 | Colovore | 6 | — | Operational |