11 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data centers in Charlotte: 11 facilities, colocation pricing
Colocation pricing and providers in Charlotte →
How many data centers are in Charlotte?
Coloprice tracks 11 data centers in Charlotte, United States: 10 operational, 1 under construction and 0 announced, run by 9 operators.
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.117
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 1 AI-ready · 8+ MW · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| Charlotte, United States | · · · | $0.117 | 11 | — |
| Germany | $250 | $0.269 | 274 | — |
| United Kingdom | $213 | $0.454 | 196 | — |
| Japan | $280 | $0.185 | 133 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Frequently asked questions
How many data centers are in Charlotte?
Coloprice tracks 11 data centers in Charlotte, United States: 10 operational, 1 under construction and 0 announced, run by 9 operators.
Which operators run data centers in Charlotte?
By number of facilities tracked: TierPoint (2), Flexential (2), PowerHouse Data Centers (1), H5 Data Centers (1), Digital Realty (1).
What is the total data center power capacity in Charlotte?
Facilities that publish capacity add up to 8 MW (3 of 11 sites disclose a figure); the largest published site is Flexential Charlotte - North with 3.3 MW.
How much does colocation cost in Charlotte, United States?
No published wholesale $/kW benchmark exists for Charlotte, United States yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 11 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Charlotte, United States?
Commercial electricity in Charlotte, United States is $0.117 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 11 facilities in our catalog, 1 of them announced or under construction.
Where is colocation cheaper near Charlotte, United States?
Charlotte, United States sits at the cheaper end of its regional cluster on the inputs we can verify. The table below compares neighbouring hubs on power tariff, facility count and round-trip time.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Charlotte, United States market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Data centers
| Facility | Operator | Power, MW | Tier | Status |
|---|---|---|---|---|
| TierPoint Charlotte (North Myers) | TierPoint | — | — | Operational |
| TierPoint Charlotte (Center Park) | TierPoint | — | — | Operational |
| PowerHouse Charlotte | PowerHouse Data Centers | — | — | Under construction |
| H5 Data Centers Charlotte | H5 Data Centers | — | — | Operational |
| Flexential Charlotte - North | Flexential | 3.3 | — | Operational |
| Flexential Charlotte - South | Flexential | 2.36 | — | Operational |
| Digital Realty CLT10 | Digital Realty | — | — | Operational |
| Altum Digital Infrastructure Charlotte | Altum Digital Infrastructure | 2.4 | — | Operational |
| NextArray Charlotte | NextArray | — | — | Operational |
| DC74-CLT4 | DC74 Data Centers | — | — | Operational |
| CENTRA CLT01 - Charlotte NC (701 E Trade) | CENTRA Digital Interconnect | — | — | Operational |
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Nearby data center markets
United States
Colocation quotes in Charlotte: free, reply within one business day
Get Quotes →